|
| 1 | 2.32Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 2 | 2.8.1Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 3 | 50.10.2Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 4 | OD307620/2025-2026Energizer with following specifications 24 V Energizer (1) Must be from a reputed company (2) Mustconfirm to BIS std 302-2-76 and national and international stander's safety (3 ) Switch to high and low power setting 4 solar panel option to re charge 12 V Battery 5.Should possesses the following out put characters 1 peak o/p voltage not more than 10 kv on soak load 2 o/o energy 3.5 / minim 3 pulse duration 1.01-3 .0 M sec 4 pulse interval 1.1 -1.4 sec 5 peak correct 7.0-8.0 a heigh 6 . 3 yearswarranty against manufacturing defects |
| 5 | Supply of Digital Charge Controller Unit 12 V 12AMP |
| 6 | OD292813/2025-2026SOLAR MODULE STAND AND PANEL SETTINGSTAND<br>MS angle,strips and pole 50 NB. Hot dip galvanized to minimum of 30 microns zinc coatingthickness. to suit PV module. Titled to 15 degree to be grouted properly and 10 yearswarranty against manufacturing defect |
| 7 | OD292815/2025-2026LIGHTNING DIVERTING KIT<br>Must be capable of diverting stray lightening. The diverter assembly must be adjustable for spark gaps.<br>Lightning diverter kit should be as close as possible to the Energizer<br>Adequate earthing to be provided |
| 8 | OD292858/2025-2026TOOL KIT<br>Should contain: Wire tightner handle, Twisting tool, Pliers, Double ended spanner for clamp tightning |
| 9 | OD292860/2025-2026LEAD OUT CABLE<br>Must be double insulated with standing 15 kv voltagages. Inner core wiremust be hot dip galvanized. For under gate and base unit connection |
| 10 | OD292867/2025-2026Warning sign<br>Warming sign boards, polyethylene plastic with statutory color and signsYellow with black lettering in local language |
| 11 | OD292879/2025-2026Joint clamp |
| 12 | OD292885/2025-2026SUPER STRAIN INSULATOR |
| 13 | OD292887/2025-2026Winding 14 G WIRE SWG galvanized. |
| 14 | OD292893/2025-2026SUPER EARTH KIT <br>Earthing system <br>Must contain earth mixture capable of retaining moisture. 8 mm Diametre stainless steel rod, non rusting quality of at least 4 feet length Should be capable of providing proper earthing to thesystem |
| 15 | OD292899/2025-2026WIRE TIGHTNER In suit tighteners for proper tensioning of wires should be made from A1-alloy non rusting quality |
| 16 | OD293001/2025-2026ACSR 12 G WIRE high tensile wire galvanized 230-300 GSM |
| 17 | OD293004/2025-2026REEL INSULATOR made of Polypropylene 15 KV UV stabilized |
| 18 | OD293007/2025-202612 V tubular battery, 100 AH |
| 19 | OD293009/2025-2026Solar Module with following specification(1) 150 wats 12 Volt retaining withminimum 10 years warranty against manufacturing deffects (2) Solar charge controller to regulate the charging of thebattery |
| 20 | CLAMP 50 mm HOT DIPPING GALVANIZED for fixing cornerand supporting posts |
| 21 | OD293021/2025-2026Installation charges. Fencing line should install as per std specification and from the direction of Officer in charge |
| 22 | OD293023/2025-2026Supplying Digital Volt meter |
| 23 | GSM Alert system |
| 24 | OD307434/2025-2026Supplying Gate Handle Set |
| 25 | OD307439/2025-2026Supplying Tension Spring |
| 26 | OD307452/2025-2026Installation of Main Earth Including Earth Mixture Please Enable Macros to View BoQ information |