| 1 | Construction of Culvert |
| 2 | OD462053/2025-2026::RING BUND Type l putting up ring bund as per approved shape 2.5 m bottom width ,1mtop width using empty gunny /polythene bags filled with earth placed in two rows at.0.6m appart andfilled in between with puddle clay to form bund for an average height 2 m including |
| 3 | OD462052/2025-2026:Bailing outwater using 5HP PUMP Bailingou of water with 5HP engine and pump setincluding conveyance to site and errection cost of fuel lubrication oil and other stores,pay of staff etc complete |
| 4 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth |
| 5 | OD466762/2025-2026:Coconut pile-Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost conveyance, labour charges etc complete |
| 6 | OD466761/2025-2026:Coconut pile- Driving down coconut pile to line and levels through various strata including all hire charges and laboures for fixing, staging platform and all other appliances necessary for pile driving down after pointing the bottom end. |
| 7 | OD466760/2025-2026:Cutting and removing excess length of wooden /coconut piles to lines and levels and removing the cut end of piles and stacking within 150m etc complete |
| 8 | 14.8:Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 |
| 9 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 |
| 10 | 11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>V. R.C.C. grade M 25 |
| 11 | 12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> IV. R.C.C. grade M 25 |
| 12 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 13 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. |
| 14 | 11.6.3.2:Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.<br>III. Random Rubble Masonry <br>(ii) In cement mortar 1:4 |
| 15 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 16 | OD425011/2025-2026:Construction of embankment with approved material obtained fromborrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope andcompacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as perTechnical Specification Clause 301.5 (WITHOUT POWER ROLLER) Please Enable Macros to View BoQ information |