Name of Work:- Covering of drain from shiba House to Parichaya Gruha in ward no 9
Sl. No.
Item Description
1
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead.
2
Dismantling brick or stone masonry in lime or cement mortar under 3M height including stacking the useful materials for reuse and removing the debris within 50M lead
3
Earth work in excavation in all kinds of soil within 50M initial lead and 1.5M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3M in depth and as per the direction of the Engineer-in-charge.
4
Supplying, filling in foundation and plinth with sand in 22.5 cm (9”) thick layers including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete (Measurement will be taken on finished compacted section only).
5
Cement concrete of proportion (1:4:8) in foundation and floors using 4cm (1½”) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour, cess and T&P required for the work etc. complete in all respect
6
Cement Concrete (1;2;4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting,lowering and laying concrete in layers,watering,curing etc.complete including cost, conveyance, royalties and taxes of all materials with labour, cess and T & P etc. required for the work complete.
7
Rigid and smooth centering & shuttering for concrete road laying with cost and conveyance charges of all materials to the site, labour and dismantaling then after due period etc complete as per the direction of Engineer -in -Charge.
8
Transportation of excavated earth away from work site by Mechanical means within 5km with loading and unloading ect complete as per EIC.
9
Straitening, Cutting, Bending Binding of MS Rod with approved design & placing in position including cost of Steel etc. complete for RCC work.
10
Hire and running charges of vibrator including supply of fuel & labour charges etc. complete
11
Supplying all materials, labour T&P for fixing Transparency Board including photography. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.