| 1 | Open well 2.50m dia |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | OD336675/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means overareas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatlydressed and Extra for every additional lift of 1.5 m or part thereof in excavation /bankingexcavated or stacked materials. All kinds of soil. for FIRST DEPTH (1.50m to 3.00m) |
| 4 | 5.4:Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources) |
| 6 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 7 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 8 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | OD544480/2024-2025:Sinking well in all classes of soil other than rock to lines and levels and plumb byscooping out form inside and below the steining including the use of dredgers or any other appliance, hireand labour for knetledge, jetting, dewatering, blasting, vibrating or any other method including removal ofobstacles and dumping the spoil withing a distance of 150 m (wells upto 4.00 m outer dia - initial depth of3.00 m below spring level. |
| 10 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 11 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 12 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 13 | 13.71:Lettering with black Japan pint of approved brand and manufacture |
| 14 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 15 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) Please Enable Macros to View BoQ information |