| 1 | Supplying and fixing the HDPE Floating Dock mounted with antiskid top plate having the following specifications:-a)Size of each module-0.5mx0.5m x 0.4m b)Shape of each module–Modules side surface should be held together 3dimensionally due to theirmale female interlocking shape such that they offer much higher pressure resistance and strength in water. c) Weight of each module–Not less than 8 Kg (+- 5%) including top cover. d)Weight carrying capacity of each module – 350 Kg per sq.m or more. e) Raw material of module–High Density Polyethylene (HDPE) 5261Z f) Seperate Top Cover (Thickness) 15mm(+-5) thickness of top cover of same material to assure sufficient protection and it . g) Lug thichness–22mm(+-5%) to ensure sufficient strength. h) Accessories and connectors Made of same material to avoid frictional damage. i) Anchoring system with concrete blocks, counter blocks anchor balance unit , etc–As per requirement of system at site . J) Complete accessories , fenders ,cleats assembly equipment including railing and their ropes–As per requirement of system at site. k) Warranty of products – 25 years l)Test certificates (issued by CIPET or any Govt.Registered body) Density : 0.954 gm/cc (+-5%) Melt flowrate : < 2gm /10min @21.6Kg 190ºcTensile stress at yield : >27 190ºc Tensile stress at yield : >27 Mpa a t23ºc(+5%) Tensile modulus:1200 Mpa at 23ºc (+5%) Tensile 1200 Mpa at 23ºc (+5%) Tensile Strength at Yield : 279 kgf/cm2 Tensile strength at Break : 367 kgf/ cm2 Tensile strength at Yield : > 8% Melting Point : 134 (+5%) |
| 2 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position excluding the priming coat, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 3 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position excluding priming coat etc. complete. |
| 4 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On Steel Work |
| 5 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts,fasteners etc.). |
| 6 | Dismantling and refitting of the existing floating dock to the newly installed HDPE floating dock, including replacement of damaged components, with all labour charges but excluding material cost, complete as directed by the Engineer-in-Charge. |
| 7 | Supplying and fixing a locking system for connecting the roof structure to the floating docks and hand rails using HDPE pins and washers with SS plate connections, secured by nylon belt with nut-bolt / riveted system, including all labour and material costs, complete as directed by the Engineer-in-Charge. |
| 8 | Supplying and fixing HDPE floating dock lock pin for the replacement of the damaged pin connecting the already installed floating docks, including the cost of the HDPE lock pin, all labour charges, and all incidental charges, complete, as directed by the Engineer-in-Charge. |
| 9 | Supplying and fixing a locking system between the handrails provided on floating docks, using 2-inch wide nylon belts and nylon plates of standard thickness, securely fixed with nut-and-bolt or riveted arrangements, including all labour, materials, tools, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 10 | Supplying and fixing a locking system for connecting the steel safety handrails to the floating docks, using SS plates and SS pipes, HDPE washers, and nylon/SS washers, fixed with nut-and-bolt or riveted arrangements, including all labour, materials, tools, and incidental charges, complete as directed by the Engineer-in-Charge |
| 11 | Supplying and fixing 10 mm diameter nylon rope for securing the boat jetty to the shore at the boat landing, including all labour, materials, tools, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 12 | Supplying and fixing FRP sheet roofing and side coverings in approved colour, made of two layers of 450 CSM, including provision of rain gutters along the two sloping edges of the roof and closures on the remaining two edges, fixed to the already fabricated steel frame, including all necessary fittings, labour, materials, tools, scaffolding, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 13 | Quoted Amount of BOQ1 in figures |
| 14 | GST Rate in percentage Please Enable Macros to View BoQ information |