| 1 | Maintenance work |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | OD382923/2024-2025:Including Lifting Charge 1.5m to 3mEarth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 3.0 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 4 | OD382924/2024-2025:Including Lifting Charge 3.00m to 4.50m,Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 4.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 5 | OD382925/2024-2025:Including Lifting Charge 4.50m to 6.00m, Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 6.00 m, disposed earth to be levelled and neatly dressed. All kinds of soil |
| 6 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 7 | OD483065/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site |
| 8 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 9 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 10 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 11 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 12 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 13 | OD461406/2024-2025:od1222713/2021_2022 :Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearestsize in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.(Modified 50.6.7.1) |
| 14 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 15 | OD382926/2024-2025:Demolishing laterate stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges |
| 16 | OD382927/2024-2025:Departmental Laterate rubble stones including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site Please Enable Macros to View BoQ information |