| 1 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 2 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 3 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 4 | Stringing of 11 kV Aerial bunched cable of size 3 x 120+ 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 5 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 6 | Fiting One no MVT on existing cross arm including 2 nos end termination (for One phase) of any rating for 11 kV AB Cable |
| 7 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 8 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 9 | Erection of suspension clamp for 11KV ABC of any size |
| 10 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 11 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 12 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 13 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 14 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 15 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 16 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 17 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. Please Enable Macros to View BoQ information |