|
| 1 | Part I -Overhauling and Essential work |
| 2 | OD84473/2025-2026:Dismantling the 90 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint. |
| 3 | OD84467/2025-2026:Dismantling the 5HP motor into stator and rotor, cleaning the windings,attending minor repairs, retaping the coils if necessary, varnishing the coils withbest quality insulation varnish, cleaning and greasing the bearings with Lithiumbase grease, heating and baking the windings, reassembling, test runningincluding scrapping, cleaning and painting with 2 coats of Grey enamel paint. |
| 4 | OD84474/2025-2026:Dismantling the starter of 90 HP motor parts by parts, draining the oil,filtering the oil, cleaning the, terminal contacts, cutting, levelling and polishing thecontacts wherever necessary, checking the tripping mechanism, replacing thedamaged wires, attending minor repairs, and refitting, resetting and making thestarter in good working condition. |
| 5 | OD84470/2025-2026:Supply and filling the transformer oil of good quality to the Transformer /starter/ regulator etc as required |
| 6 | OD84465/2025-2026:Supply and renewal of coupling bolt of 90 Hp motor |
| 7 | OD84472/2025-2026:Supply and renewal of coupling bush for 5hp motor pumpset |
| 8 | OD84471/2025-2026:Supply and renewl of coupling bush in position of 90 Hp motor |
| 9 | OD84469/2025-2026:Supply of cotton waste |
| 10 | OD84476/2025-2026:Supply of bearing grase |
| 11 | OD84466/2025-2026:Supply of gland packing |
| 12 | OD84475/2025-2026:Scrapping, cleaning and painting the Suction / Delivery side MS Pipe withAnticorrossive bituminous black paint over a coat of zinc rich primer |
| 13 | OD84464/2025-2026:Charges for dismantling the 100 HP ES. pump and taking out the impeller shaftassembly and placing to the floor of the pump house , dismantling the same partsby parts, cleaning the pump case, chamber case, conveying to the nearest workshop reconditioning the damagedparts, attending minor works etc and assembling the impeller shaft assemblyusing fresh gland packing, gasket packing, grease, shellac etc. Refitting the pumpusing fresh bolt, nut etc.and making the same in good working condition taking trial run etccomplete. |
| 14 | OD84468/2025-2026:Supplying 200 A HRC DIN type fuse link or equivalent |
| 15 | OD84477/2025-2026:Charges for cleaning and removing unwanted plant growth from transformer yard and pump house. |
| 16 | 90.3.19.4:1200 mm 2X20W LED Lamp with box type fixture |
| 17 | OD310636/2025-2026:supply and installation of handle assembly for existing 315 A SDF |
| 18 | PART II- Provision for work to be executed only under emergency |
| 19 | 2.1.7:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.320 Amp TP&N |
| 20 | OD84478/2025-2026:Supply and installation of NO volt coil suitable for the 90 HP star delta oil immersed type starter- |
| 21 | OD312431/2025-2026:Supply and installation of LED indicators for all voltage ranges Red Green Black Yellow |
| 22 | OD312432/2025-2026:Supply installation of damaged blue colour led indicators in the panel board |
| 23 | OD336264/2025-2026:Supply installation of 15 KVAR , Metalised poly propeline capacitor standard duty, 440V Cylinderical and giving connection etc as required. |
| 24 | OD336274/2025-2026:Supply installation of 2KVAR , Metalised poly propeline capacitor standard duty, 440V Cylinderical and giving connection etc as required. |
| 25 | OD336302/2025-2026:Supply installation of 1KVAR , Metalised poly propeline capacitor standard duty, 440V Cylinderical and giving connection etc as required. Please Enable Macros to View BoQ information |