| 1 | Abstract |
| 2 | Clearing light jungle by cutting, removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees upto 300mm girth (Specification Number as per MORT&H Rev.V 201) |
| 3 | Picking the existing BT surface and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and incidental charges etc., complete as per standard specifications as per MORT&H Rev. V specifications No. 111, 112, 202 |
| 4 | Construction of Granular Sub-Base Grade V of 100mm thick by Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 5 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 |
| 6 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,502,900) |
| 7 | Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,503,900) |
| 8 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 |
| 9 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 10 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance |
| 11 | Providing RCC M15 Grade Precast HM stone of standard desing as per IRC 8-1980 and fixing in position including painting and Lettering etc., complete (as per MORTH SPECIFICATION No.805) |
| 12 | Providing RCC M15 Grade Precast KM stone of standard desing as per IRC 8-1980 and fixing in position including painting and Lettering ect., complete (as per MORTH SPECIFICATION No.805) |
| 13 | Retaining wall - Earth work excavation and depositing onbank within initial lead and lift 10mts & 2mts respectively in hard stiff clay, stiff balck cotton, hard red earth, shalves, murams, gravel, stoney earth and earth mixed with small size boulders and gravelly soil-SS 20B |
| 14 | Retaining wall - Plain cement concrete 1:5:10 using 40mm HG metal including cost and conveyance of all materials and labour charges etc., complete (S.I. 122) -10M3 |
| 15 | Retaining wall - Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting 3m high-10 m2 (S.I.154) |
| 16 | Retaining wall - PCC 1:2:4, using 20mm metal for RCC work including cost and conveyance of all materials and labour charges etc., complete, 10 M3 (S.I-133) |
| 17 | Retaining wall - Plastering in cm 1:5, 20mm thick including cost and conveyance of all mateials and labour charges etc., (S.I 306) |
| 18 | Construction of chamber for 100mm sluices valve Please Enable Macros to View BoQ information |