| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MoRTH specification clause No. 301 |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MoRTH specification clause No. 305(3.17) |
| 3 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. As per MoRTH specification clause No. 305(3.18) |
| 4 | Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete As per MoRTH specification clause No. 401 |
| 5 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MoRTH specification clause No. 406(1.14) |
| 6 | Prime coat Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MoRTH specification clause No. 502 |
| 7 | Dense Graded Bituminous Macadam Grading 2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per MoRTH specification clause No. 505 |
| 8 | Tack coat Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MoRTH specification clause No. 503 |
| 9 | Bituminous Concrete Providing and laying bituminous concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 10 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. as per MORTH specification clause No. 601 complete in all respects |
| 11 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 422 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per MORTH specification clause No. 602 complete in all respects |
| 12 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. As per MoRTH specification clause No. 304 |
| 13 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 (Cement OPC-43 grade) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MoRTH specification clause No. 2100 |
| 14 | Stone masonary/Brick Work.Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. As per MoRTH specification clause No. 12.7 |
| 15 | R.C.C. grade M 20 Plain/Reinforced Cement Concrete(Cement OPC-43 grade) in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump. As per MoRTH specification clause No. 12.8 |
| 16 | Reinforcement work(Substructure) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. As per MoRTH specification clause No. 1600 & 2200 |
| 17 | Pointing Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. As per MoRTH specification clause No. 1300 & 2200(13.2) |
| 18 | Plastering Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications. As per MoRTH specification clause No. 1300 & 2200(13.3) |
| 19 | Providing and Laying Interlocking Concret Block Pavement having thickness 80 mm as per drawing and Technical Specifiaction Clause 1500 of MORD Specification. |
| 20 | Providing and Relaying Interlocking Concret Block Pavement having thickness 80 mm as per drawing and Technical Specifiaction Clause 1500 of MORD Specification. |
| 21 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm |
| 22 | Dismantling of Structure Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately |
| 23 | Painting or varnishing new work with one coat (upto one sq. mt.) of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the I.S.I. No. 103-1950. As per PWDSOR 641+642 |
| 24 | R.C.C. grade M 25 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & Concrete pump Please Enable Macros to View BoQ information |