|
| 1 | Taking down cement plaster on any description including removing old APP membrane, scrubbing down with water and prepare to receive new plastering. |
| 2 | Material and labour Cutting out cracks to V-section in existing roofs or terracing, cleaning out and filling solidly with a hot mixture of bitumen and clean dry sand 1:1 (by weight) complete all as specified and directed. |
| 3 | M&L 12 mm thick Plaster on RCC roof slab and sunken portion with CM ( 1:3 ) using water proofing compound @ 200ml/ bag of cement shall be carried out as specified. (Note : WPC shall be measured and paid separately) |
| 4 | M&L for PCC (1:2:4) type B-0, using 12.5 mm graded stone aggregate as in roof padding / sunken floors and similar work using WPC @ 200ml/ Bag of cement complete all as specified. (Note : WPC shall be measured and paid separately) |
| 5 | Supply only liquid water proofing compound |
| 6 | M&L for Applying oil bound bituminous primer @ 0.20 Kg/Sqm and providing 4mm thick APP modified water proofing membrane weighing not.less than 4.0 Kg/Sqm reinforced with non Woven polyester matt weighing not.less than 150o Centigrade , having tensile strength of 650 N/5 cm and 350 N/5 cm in longitudnal and transverse direction respectively of the reinforcement, tearing strength of 180N by torch application with minimum 10 cm side over lap and 15cm over lap, applying a coat of blown grade hot bitumen 90/15 over the membrane @ 1.2 Kg /sqm over the membrane a coat of solar reflective bituminous aluminium paint @ 0.10 Kg per sqm all as specified. Note :- removing and refxing of earth strip, roof area of solar panels also need to done int his job. |
| 7 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store boreof pipe in 20 mm. |
| 8 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store boreof pipe in 25 mm. |
| 9 | Refixing old steel tubing and connection in new or old position (walls, ceiling, floors, etc.) bore of pipe in 20mm . |
| 10 | Refixing old steel tubing and connection in new or old position (walls, ceiling, floors, etc.) bore of pipe in 25mm . |
| 11 | S&L ' Medium grade' galvanised Tubes 20 mm dia, with all tube fillings (such as bends, elbows, tees, short pieces, connectors, backnuts, diminishing pieces, caps, plugs and unions, etc.) and fixing complete with clips, wall hooks, wooden plugs, or laying in trenches, etc., fitting and fixed complete to walls and ceilings or laid in floors. |
| 12 | S&L ' Medium grade' galvanised Tubes 25 mm dia, with all tube fillings (such as bends, elbows, tees, short pieces, connectors, backnuts, diminishing pieces, caps, plugs and unions, etc.) and fixing complete with clips, wall hooks, wooden plugs, or laying in trenches, etc., fitting and fixed complete to walls and ceilings or laid in floors. |
| 13 | S&F in Gun-metal globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed , bore of pipe 20mm. |
| 14 | Disconnecting existing tanks, setting aside (or lowering if required ) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position . Capacity of tank upto 1000Lts. |
| 15 | S&F in Repairs PVC Rotational moulded polyethylene water storage tanks 500 Liter (cylindrical vertical with closed top) hoisted and fixed in position all as specified and Dismantling water tanks and removing to store. |
| 16 | S&F in Repairs PVC Rotational moulded polyethylene water storage tanks 1000 Liter (cylindrical vertical with closed top) hoisted and fixed in position all as specified and Dismantling water tanks and removing to store. |
| 17 | Removing building materials etc. to a distance of n exceeding 5 KM ,beyond the lead included in the rates, including loading, unloading and stacking at the destination. Please Enable Macros to View BoQ information |