| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use for Pressed Tiles & Weathering Course |
| 2 | Labour charges for Removing the Existing cut stone Structure ( Ubabeedam, Adisthanam, Pavukkal, Ullvari, Kalvari) including, Numbering all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and stacking them in the places shown by the Departmental Officers etc complete.,as per standard specification. |
| 3 | Labour charges for Removing the Existing cut stone Structure ( Thani Thoon, Bothiyal, Uthiram) including, Numbering all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and stacking them in the places shown by the Departmental Officers etc complete.,as per standard specification. |
| 4 | Dismantling, clearing away and carefully stacking materials useful for re-use for Brick / Stone Masonry in Lime mortar walls under 3m high including all incidental charges etc complete. |
| 5 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. |
| 6 | Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand. |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 8 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 9 | Centering upto grade beam |
| 10 | Centering for Curved surface (Roof Slab) |
| 11 | Providing and laying position,Standardised concrete M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors,finishing,curing,etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the ecess usage of materials.) |
| 12 | For foundation and basement |
| 13 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 14 | Random Rubble masonry work in Lime mortor 1:1.5 ( One of Lime and One & half of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications. |
| 15 | Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification |
| 16 | Cut stone upto 5' |
| 17 | Cut stone upto 5' - 10' |
| 18 | Cut stone block upto 10 feet to 14 feet |
| 19 | Labour Charges for Old Stone Re-fixing Eludham, Kabothagam, Viyalam, Koodu, Ull Vari, Pavukkal, Thun, Flooring, Nilaikal, Ect .. including, Numbering all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and stacking them in the places shown by the Departmental Officers etc complete.,as per standard specification.. |
| 20 | Labour charges for Dressing & Fixing the Cut stone for 3 line dressed on all face set in Cement Mortar 1:3 including handling charges cost of tools and fixing in position etc., complete with standard specifications. |
| 21 | Chithiravanam |
| 22 | Ubabeedam,Adhistanam |
| 23 | Kalvari, Kalasam thadi |
| 24 | Ullvari |
| 25 | Uthiram |
| 26 | Pavukal For - Roof |
| 27 | Nilaikal |
| 28 | Providing and laying Brick Jelly Lime Concrete 1:2:5 using 20mm brick jelly in Lime Mortar 1:2 for core wall complete as per standard specification and as directed by the deparmental officers. |
| 29 | Brick masonry Lime mortar 1:2 (One Lime and Two sand) using Country bricks size 8 -3/4\\"x4 1/4\\"x2 3/4\\" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram |
| 30 | Kalkaram up to 15'0\\" |
| 31 | Vimanam / Gopuram of height up to 25' 0\\" (excluding kalkaram) |
| 32 | Brick work using Country Bricks of size 8-3/4\\" x 4-1/4\\" X2-3/4\\"\\" in Lime Mortar 1:2 (One lime and two sand ) including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
| 33 | For super structure |
| 34 | Brick work using Country Bricks of size 8-3/4\\" x 4-1/4\\" X2-3/4\\"\\" in Cement Mortar 1:5 (One cement and five sand) including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
| 35 | For Foundation & Basement |
| 36 | For Super structure |
| 37 | Dome/wall brick in Lime mortar 1:2 (One Lime and Two Sand) using Third class Country bricks size 8 -3/4\\"x4 1/4\\"x2\\" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
| 38 | Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work- |
| 39 | Vimanam upto 15'0\\" |
| 40 | Vimanam upto 25'0\\" |
| 41 | Providing water jet washing in the granite portion by using appropriate equipements with all its accessories etc.from the granite surface and making it into original surface including cost and conveyance of hire charges for all tools and plants and final clearing etc complete |
| 42 | Pointing the cut stone joints with L.M 1:1.5 (One Lime and One and Half Sand) including cost of special tiles such brush and watering, curing etc complete, as per standard specifications |
| 43 | Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds . |
| 44 | For Kalkaram up to 15'0\\" |
| 45 | Vimanams / Gopurams up to 50' 0\\" height (excluding Kalkaram) |
| 46 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 (One Lime and One and Half Sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with L.M. 1:1.5 (One Lime and One and Half Sand) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area ,complete complying with standard specification and as directed by the departmental officers. |
| 47 | For Kalkaram up to 15'0\\" |
| 48 | Vimanams / Gopurams up to 15' 0\\" height (excluding Kalkaram) |
| 49 | Vimanam Upto 25'0\\" exculding Kalkaram |
| 50 | Plastering with Lime Mortar 1:1.5 (One Lime and One and half of Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 51 | Plastering with Lime Mortar 1:1.5 (One lime and One and Half Sand),20mm thick mixed with water proofing compound in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 52 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 53 | Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area - |
| 54 | Vimanams / Gopurams up to 15' 0\\" height (excluding Kalkaram) |
| 55 | Vimanams / Gopurams up to 25' 0\\" height (excluding Kalkaram) |
| 56 | Painting two coats of newly plastered wall surface with Water based Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 57 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications |
| 58 | (Up to 7' height) |
| 59 | (Above 7' height) |
| 60 | Best varnish two coats for wood works etc, complete complying with standard specifications. |
| 61 | Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications. |
| 62 | Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications. |
| 63 | Providing granolithic floor finish of 25 mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) |
| 64 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor1:1.5 etc complete. |
| 65 | Inner flooring |
| 66 | Outer flooring |
| 67 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 68 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 69 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:1:5 finishing the same with Lime Mortor 1:1:5 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) |
| 70 | Sudhai size above 1' 0\\" upto 2' 6\\" |
| 71 | Sudhai size above 2' 6\\" upto 3' 6\\" |
| 72 | Add GST 18% Please Enable Macros to View BoQ information |