| 1 | Removable of rank vegetation/weeds and undesirable vegetation from shoulders,embankment slopes upto ROW(both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside ROW as per direction of Engineer-in-charge and as per maintenance Standards Clause 3.3 (Frequency will be once in a quarter) (SOP - Road Maintenance - Item No - 2.3) |
| 2 | a) Shoulder including side slopes of embankment upto toe line on both sides of the carriageway.(Frequency of cleaning will be four times in a year; however limited to only areas prone to growth of rank/undesirable vegetation and weeds). |
| 3 | Non - Corporation - Km 3/0 - 8/350, Km 57/6 - 58/7 and Km 113/4 - 114/1 of NH 81 |
| 4 | Providing spot reconditioning, reconstruction and regravelling to repair specific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and fills slopes/ shoulders conforming to Technical Specifcations Clause no. 3002. Fiel material should be brought from borrow areas located outside ROW conforming to Technical Specification no. 305 Watered and well compacted With plate Compactor or power rammer with all leads and lifts as directed by the Engineer (Quantity of Compacted Fill material to be measured on cross sectional area basis) (SOP - Road Maintenance - Item No - 10.2) |
| 5 | Non - Corporation - Km 3/0 - 8/350, Km 57/6 - 58/7 and Km 113/4 - 114/1of NH 81 |
| 6 | Clearing and removing silt deposit abutting the Centre Median on both sides for an average width of 0.75m on either sides including collection and removing of silt deposit, loading including conveying away including conveyance charges, traffic diversion etc., complete |
| 7 | Non - Corporation - Km 3/0 - 8/350, Km 56/2 - 57/0, Km 57/6 - 58/7, Km 72/6 - 76/6 and Km 113/4 - 114/1of NH 81 |
| 8 | Painting Two Coats on old Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on old plastered concrete surfaces) (Frequency of Painting will be as per site requirement however limited to once in a year) |
| 9 | Non - Corporation - Km 3/0 - 8/350, Km 56/2 - 57/0, Km 57/6 - 58/7, Km 72/6 - 76/6 and Km 113/4 - 114/1of NH 81 |
| 10 | Clearing Slab/Box type Culverts and pipe culverts including clearing, cleaning and reshaping of upstream faces of these culverts with in right of way. The job includes disposal of excess material recovered from site including vegitation outside ROW with all leads and lifts complete in all respect as per direction of Engineer-in-charge and as per maintenance Standards Clause 3.1 (Frequency of cleaning wiil be one time in a year i.e before start of monsoon) - (SOP - Road Maintenance - Item No - 1.80) |
| 11 | Culvert upto 3 M |
| 12 | Culvert- 3 M to 10M |
| 13 | Pavement Repairs |
| 14 | Providing treatment and repair to pot holes / ruts and any depth / patch repair of all types of bitumen pavement complete as per Technical Specification Clause 3004.2 and as per direction of engineer by using paving grade bitumen / emulsion/ cold ready mix material. the job includes removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 of Technical Specification.Grading-II |
| 15 | Non - Corporation - Km 3/0 - 8/350, Km 56/2 - 57/0, Km 57/6 - 58/7, Km 72/6 - 76/6 and Km 113/4 - 114/1of NH 81 |
| 16 | Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision),including painting and numbering etc., and all other incidental charges etc., complete. |
| 17 | Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete. |
| 18 | Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803. |
| 19 | Km 3/0 - 8/350 & Km 72/6 - 76/6 (B/s) single coat & Km 113/4 - 114/1 (B/s) Please Enable Macros to View BoQ information |