| 1 | Fitting one Additional 2.4m Channel cross arm (75x40x6mm), in existing single pole including conveyance of materials. As per Distribution data key No: 185 |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 3 | Erection of tower super structures above ground level including erection of normal and special hillside extention members where ever necessary,providing tower accessories like phase,danger & number plates,bird guards anticlimbing device etc complete. (transmission line data item 18) |
| 4 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.As per Distribution data key No:157 |
| 5 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. As per Distribution data key No:160 |
| 6 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. As per Distribution data key No:161 |
| 7 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. As per Distribution data key No:159 |
| 8 | Paving out, stringing and tensioning as per std of 6 line ACSR dog conductors including attaching insulator string with arcing horns or rings on to the tower crossarms, clamping the conductors to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at the tension points, jointing the conductors and pilot wire where ever necessary, installation of vibration dampers, hire charges of tractor and strining tools, all hire and labour for protective trestle work, providing suitable back stays at the time of stringing etc complete |
| 9 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.As per Distribution data key No: 565 |
| 10 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.As per Distribution data key No:567 |
| 11 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.As per Distribution data key No:513 |
| 12 | Dismantling one HT pin insulator with pin and bring back to section store.As per Distribution data key No: 518 |
| 13 | Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.As per Distribution data key No:514 |
| 14 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling As per Distribution data key No: 555 |
| 15 | Dismantling one LT 2 line cross arm from existing pole. As per Distribution data key No: 560 |
| 16 | Dismantling one LT 4 line cross arm from existing pole. As per Distribution data key No: 561 |
| 17 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. As per Distribution data key No:504 |
| 18 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.As per Distribution data key No: 503 |
| 19 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.As per Distribution data key No: 554 |
| 20 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.As per Distribution data key No: 559 |
| 21 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 (Street Light) + 1 x 50 Sq.mm. (Insulated Messenger)(Distribution data - Key no 2018) |
| 22 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles((Distribution data - Key no 1105) |
| 23 | Erection of Anchor clamp / dead end clamp for LT ABC of any size(Distribution data) |
| 24 | Dismantling of Anchor clamp / dead end clamp for LT AB cable(Distribution data) |
| 25 | Erection of suspension clamp for LT ABC of any size(Distribution data) |
| 26 | Dismantling of suspension clamp suitable for LT AB cable(Distribution data) |
| 27 | Providing Cable Tie(Distribution data) |
| 28 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm(Distribution data) |
| 29 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm(Distribution data) |
| 30 | Providing End Caps(Distribution data) |
| 31 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size(Distribution data) |
| 32 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. Distribution data key No: 419 |
| 33 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.As per Distribution data key No: 135 |
| 34 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.As per Distribution data key No: 169 |
| 35 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.As per Distribution data key No: 170 |
| 36 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.As per Distribution data key No: 5.5 |
| 37 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.As per Distribution data key No: 451 |
| 38 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.As per Distribution data key No:452 |
| 39 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.As per Distribution data key No: 610 |
| 40 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (As per DAR 2021 Item No.2.8.1) |
| 41 | Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. All kinds of soil (As per DAR 2021 Item No.2.26.1) |
| 42 | Providing and laying in position cement concrete 1:4:8 of specified grade excluding the cost of centering and shuttering - All works up to plinth level using 40 mm stone aggregate. 1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) I (As per DAR 2021 Item No.4.1.8) |
| 43 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1 1/2:3 ((1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominalsize derived from natural sources) (As per DAR 2021 Item No.4.1.2) |
| 44 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete. Item No.5.9.1 (As per DAR 2021) |
| 45 | Fixing and levelling the stub in position to the lines and levels for concreting foundation of 33kV, 11kV yard structures and equipments (Observed data) |
| 46 | 12 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) Item No.13.1.1.(As per DAR 2021) |
| 47 | Filling available excavated earth (Excluding rock) in trenches, Plinth, side of foundation etc, in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50 M lift up to 1.5 M (As per DAR2021 item no: 2.25 ) |
| 48 | Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc 1. Line conductors (item No:2 of data for construction of transmission lines) - Up to 5 km -Line and Earth Conductor |
| 49 | Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc Insulators and Accessories (item No:2 of data for construction of transmission lines) - Up to 60 km |
| 50 | Transport of materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary loading and unloading charges etc Towers, Extension and other structures including earthing materials etc (item No:2 of data for construction of transmission lines) - Up to 60 km |
| 51 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. As per Distribution data key No: 726 |
| 52 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). As per Distribution data key No: 727 |
| 53 | Loading MS / GI materials hard ware fittings of line work and clamps for equipments and bus from the place of its storage to department lorry and make it ready for transportation as per the direction of departmental officers. ( Trans data item 111 ) |
| 54 | Unloading MS / GI materials, hard ware fittings of line work and clamps for equipments and bus from department lorry to substation site and stacking for proper storage as per the direction of departmental officers. ( Trans data item 112 ) |
| 55 | Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally ( Trans data item 70 ) |
| 56 | Drilling holes in yard structure ( Trans data item 72 ) |
| 57 | Cutting of steel angle in yard structure erection ( Trans data item 73 ) |
| 58 | Welding charge for welding on iron parts using arc welding as per standards ( Trans data item 74 ) |
| 59 | Drilling hole of various sizes on existing Channel/Cross Arm. As per Distribution data key No: 363 |
| 60 | Additional rate for providing one disc set on any type of HT pole for making cut point As per Distribution data key No: 115. |
| 61 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.As per Distribution data key No: 174 |
| 62 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.As per Distribution data key No: 175 |
| 63 | Fitting one additional HT pin with insulatorAs per Distribution data key No: 179 |
| 64 | Transporting earth upto a distnace of 1kM including loading, unloading, stacking etc. complete (DSR 2021, Carriage of materials,item no:1.1.2) |
| 65 | Providing and laying in position cement concrete 1:2:4 of specified grade excluding the cost of centering and shuttering - All work up to plinth level using 20 mm stone aggregate (DAR 2021,Item No: 4.1.3) |
| 66 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more Item No.5.22.6 (As per DAR 2021) |
| 67 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Item No.5.2.2 (As per DAR 2021) |
| 68 | Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts Item No.5.9.6 (As per DAR 2021) |
| 69 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 30 cm girth up to and including 60 cm girth ( DAR 2021, item no: 2.33.1) |
| 70 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 60 cm girth up to and including 120 cm girth (DAR 2021, item no: 2.33.2) |
| 71 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth ( DAR 2021, item no: 2.33.3) |
| 72 | Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( DAR 2021, item no: 50.2.33.5) |
| 73 | Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( DAR 2021, item no: 50.2.33.6) |
| 74 | Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. ( DAR 2021, item no: 50.2.33.7) |
| 75 | Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. (DAR 2021, item no: 50.2.33.8) Please Enable Macros to View BoQ information |