| 1 | Clearing site and conduction soil test |
| 2 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 3 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth |
| 4 | OD103433/2024-2025:Soil Testing |
| 5 | Construction of Well |
| 6 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 7 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 8 | OD103437/2024-2025:Earth work in excavation by mechanical means ( Hydraulic excavator)/manual means over areas( exceeding 30cm in depth,150cm in width as well as 10 sqm on plan) including disposal of excavated earth, disposed earth to be levelled and neatly dressed for Manhole 2nd depth 1.5m to 3m |
| 9 | OD103438/2024-2025:Fabricating MS Kerb of size using 8 mm thick MS plate including cost ms plate and 10mm dia anger bar welded to the kerb and conveyance charges of MS plate,all fabrication charges, charges of painting outer side of the steel work with two or more coat deluxe multi surface paint to give an even shade over an under coat of primer erection tying anger bar with reinforcement placing in position etc complete: |
| 10 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources) |
| 11 | 100.3.7.1:Earthwork in open well excavation (above water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. |
| 12 | OD103439/2024-2025:Sinking wells (third depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 3 to 4.5m (vide KWA SoR KW.5.4) |
| 13 | OD103440/2024-2025:Sinking wells (fourth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 4.5 to 6 m (vide KWA SoR KW.5.4) |
| 14 | OD103441/2024-2025:Sinking wells (fifth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 6 to 7.5 m (vide KWA SoR KW.5.4) |
| 15 | OD103442/2024-2025:Sinking wells (sixth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 7.5 to 9 m (vide KWA SoR KW.5.4) |
| 16 | OD103448/2024-2025:Sinking wells (seventh depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 9 to 10.5 m (vide KWA SoR KW.5.4) |
| 17 | OD103447/2024-2025:Sinking wells (eighth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 10.5 to 12 m (vide KWA SoR KW.5.4) |
| 18 | OD103449/2024-2025:Sinking wells (nineth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 12 to 13.5 m (vide KWA SoR KW.5.4) |
| 19 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 20 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 21 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 22 | 4.15:Extra for laying concrete in or under water and or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. |
| 23 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 24 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 25 | 19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design |
| 26 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . |
| 27 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 28 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 29 | OD103443/2024-2025: Removal of excess earth by lorry for minimum mechanical conveyance and less royalty of earth |
| 30 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 31 | 100.98.1008:Engaging Coolie. |
| 32 | 100.98.1035:Engaging sewer man. |
| 33 | Construction of Valve Chamber |
| 34 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 35 | OD103434/2024-2025:Earth work in excavation by mechanical means ( Hydraulic excavator)/manual means over areas( exceeding 30cm in depth,150cm in width as well as 10 sqm on plan) including disposal of excavated earth, disposed earth to be levelled and neatly dressed for Manhole 2nd depth 1.5m to 3m |
| 36 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 37 | 100.3.7.1:Earthwork in open well excavation (above water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. |
| 38 | OD103435/2024-2025:Sinking wells (third depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 3 to 4.5m (vide KWA SoR KW.5.4) |
| 39 | OD103453/2024-2025:Sinking wells (fourth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 4.5 to 6 m (vide KWA SoR KW.5.4) |
| 40 | OD103452/2024-2025:Sinking wells (fifth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 6 to 7.5 m (vide KWA SoR KW.5.4) |
| 41 | OD103451/2024-2025:Sinking wells (sixth depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 7.5 to 9 m (vide KWA SoR KW.5.4) |
| 42 | OD103450/2024-2025:Sinking wells (seventh depth) 7.00 m inside below spring level in all classes of soil to lines and levels and plumb by scooping out earth from inside and below the steining using necessary appliances including hire and labour for the same including dumping the spoil beyond the initial lead of 50 m etc. complete. Total depth 9 to 10.5 m (vide KWA SoR KW.5.4) |
| 43 | 2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m |
| 44 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 45 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 46 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 47 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 48 | 19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design |
| 49 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 50 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 51 | OD103456/2024-2025:Supplying 500mm dia clear open sluice gate with mechanical drive of shaft length 10m, necessary arrangements to fix on wall inside the gate chamber |
| 52 | 100.98.1008:Engaging Coolie. |
| 53 | 100.98.1009:Engaging Fitter ( grade 1). |
| 54 | 100.98.1028:Engaging Mason ( average). |
| 55 | 100.98.1035:Engaging sewer man. |
| 56 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 57 | OD103464/2024-2025: Removal of excess earth by lorry for minimum mechanical conveyance and less royalty of earth |
| 58 | Interconnection of Existing well with new well |
| 59 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 60 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 61 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 62 | 100.1.4:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 4.5m but not exceeding 6m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 63 | OD103467/2024-2025:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 6m but not exceeding 7.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 64 | OD103466/2024-2025:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 7.5m but not exceeding 9m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 65 | OD103465/2024-2025:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 7.5m but not exceeding 9m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 66 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. |
| 67 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 68 | 15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge. |
| 69 | 100.98.123:Supply of DI K9 Pipe Conforming to IS 8329/2000, 500mm Dia. |
| 70 | 100.14.9:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 500mm diameter Ductile Iron Class K-9 Pipes. |
| 71 | 18.70.9:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:500 mm dia pipes |
| 72 | 100.35.9:Testing 500mm DI/CI pipeline with potable water to the required test pressure.500 mm diaObserved Data derived from item no.1028 of PHED DATA |
| 73 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 74 | 100.98.1008:Engaging Coolie. |
| 75 | 100.98.1035:Engaging sewer man. |
| 76 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. |
| 77 | 100.98.119:Supply of DI K9 Pipe Conforming to IS 8329/2000, 300mm Dia. |
| 78 | 100.14.5:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 300mm diameter Ductile Iron Class K-9 Pipes. |
| 79 | 18.70.5:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:300 mm dia pipe |
| 80 | 100.35.5:Testing 300mm DI/CI pipeline with potable water to the required test pressure.300 mm diaObserved Data derived from item no.1023 of PHED DATA |
| 81 | 100.37.6.1:In situ fabrication of M.S. pipes of size 150mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete. |
| 82 | 100.37.6.2:Fabricating M.S. flanges of diameter 150mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 83 | 100.37.6.3:Cutting 150mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 84 | 100.37.6.4:Welding 150mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 85 | 100.37.6.5:Grinding cut and weld edges of 150mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. Please Enable Macros to View BoQ information |