| 2 | Planning, Designing, Engineering, Construction, Procurement, Installation, Testing and Commissioning of proposed 2 MLD Water Treatment Plant with rapid sand filter,Cascade Aerator,Flash Mixer,Clariflocculator,Chemical House, Filter House,Wash Water Tank ,7 Lakh Litre capacity Clearwater Sump tank, Laboratory with toilet facilities,Chlorination room, All closed or open channels or conduits connecting various units, with pipes, valves, specials, fittings, provision for back wash, all drains and manholes for collection and disposal of sludge from clarifier and wash water from the filters, etc. within the boundaries of the site, for final disposal to the nearest water course, necessary by-pass arrangements as per the flow chart with cases access to gas chlorination, necessary pumps from intake well, Interconnecting pipes, pumping arrangements to Existing Overhead Water tank, Plumbing, Joineries, sanitary fittings, Masonry compound wall with gate, internal Roads, landscaping. filling with 12 mm broken stones 5 cm thick around and in between space, Lightning arresters wherever necessary as per I.S codal Provision etc with all civil/electiral/mechanical works related for the work, site development, or any other structure / component required for smooth and efficient functioning / performance of the 2 MLD WTP at KINFRA Industrial Park, Perumabvoor to provide the treated water as per IS specifications for potable water including 60 Months Defect Liability Period from the date of commissioning. |