| 1 | OD315108/2025-2026:Hire and labour charges for providing 1x100W LED Flood light and wiring using 4 sqmm FRLS PVC insulated copper wire in position and giving connection etc (Warm /white as per the direction from the department official) fitting for 1st day |
| 2 | OD315109/2025-2026:Hire and labour charges for providing 1x100W LED Flood light and wiring using 4 sqmm FRLS PVC insulated copper wire in position and giving connection etc (Warm /white as per the direction from the department official) fitting for 2nd day to final day |
| 3 | OD315112/2025-2026:Hire and labour charges for providing 1x20W Poly carbonate body (Warm White) batten type LED tube fittings with tube as directed in position and giving connectionfor1st day |
| 4 | OD315118/2025-2026:Hire and labour charges for providing 1x20W Poly carbonate body (Warm White) batten type LED tube fittings with tube as directed in position and giving connectionfor2nd day to final day |
| 5 | OD315094/2025-2026:Hire and labour charges for providing 65W LED lamp with holder and wiring using 2.5 sqmm FRLS PVC insulated copper wire as directed in position and giving connections etc. as required for 1st day |
| 6 | OD315131/2025-2026:Hire and labour charges for providing 65W LED lamp with holder and wiring using 2.5 sqmm FRLS PVC insulated copper wire as directed in position and giving connections etc. as required for 1st day |
| 7 | OD315107/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 2 Run for 1st day |
| 8 | OD315137/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 2 Run for 2nd day to final day |
| 9 | OD315146/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 4 Run for 1st day |
| 10 | OD315105/2025-2026:Hire and labour charges for drawing 650/1100 V grade FRLS PVC insulated stranded single core copper conductor cables conforming to IS 694 clipped with No 12 SWG GI wire and giving necessary connections of the following sizes. 2.50 sq.mm 4 Run for 2nd day to final day |
| 11 | OD315134/2025-2026:Hire and labour charges for providing 3 phase 8W MCBDB with 63A 4P Isolator,63A 4P RCCB and SPMCBs as directed in position and giving connections etc. as required for 1st day |
| 12 | OD315129/2025-2026:Hire and labour charges for providing 3 phase 8W MCBDB with 63A 4P Isolator,63A 4P RCCB and SPMCBs as directed in position and giving connections etc. as required for 2nd day to final day |
| 13 | OD315145/2025-2026:Hire and labour charges for providing 3 phase 8W TPN VDB with 100A 4P Isolator,100A 4P_ RCCB and SP/TPMCBs as directed in position and giving connections etc. as required for 1st day |
| 14 | OD315117/2025-2026:Hire and labour charges for providing 3 phase 8W TPN VDB with 100A 4P Isolator,100A 4P_ RCCB and SP/TPMCBs as directed in position and giving connections etc. as required for 2nd day to final day |
| 15 | OD315102/2025-2026:Hire and labour charges for providing 100A, 4 pole On-Load Change Over Switches In SS Enclosure for the first day |
| 16 | OD315113/2025-2026:Hire and labour charges for providing 100A, 4 pole On-Load Change Over Switches In SS Enclosure for the 2 nd day to final day |
| 17 | OD315087/2025-2026:Hire and labour charges for providing pipe earthing using 50mm dia GI pipe of 1.5 m long including accessories etc. as required for 1st day |
| 18 | OD315114/2025-2026:Hire and labour charges for providing pipe earthing using 50mm dia GI pipe of 1.5 m long including accessories etc. as required for 2nd day to final day |
| 19 | OD315086/2025-2026:Hire and labour charges for providing No 10 SWG bare copper conductor and giving connection for 1st day |
| 20 | OD315140/2025-2026:Hire and labour charges for providing No 10 SWG bare copper conductor and giving connection for 2nd day to final day |
| 21 | OD315097/2025-2026:Hire and labour charges for providing 3.5x50 sqmm PVC insulated and PVC sheathed armored Al cable of 1.1 KV grade for the first day |
| 22 | OD315143/2025-2026:Hire and labour charges for providing 3.5x50 sqmm PVC insulated and PVC sheathed armored Al cable of 1.1 KV grade for the Additional days |
| 23 | OD315126/2025-2026:Hire and labour charges for providing 4 x 16 sqmm PVC insulated and PVC sheathed armored Al cable of 1.1 KV grade for the first day |
| 24 | OD315103/2025-2026:Hire and labour charges for providing 4 x 16 sqmm PVC insulated and PVC sheathed armored Al cable of 1.1 KV grade for the 2nd day final day |
| 25 | OD315098/2025-2026:Hire and labour charges for providing PAS using following accessories etc. complete and giving connection for 8 unit per day for 1st days.250w power amplifier -2nos12 cv pre amplifier – 2 nosBox with matelingtransformer-8nosMicrophone – 2nos24 v battery with battery charger – 2nos3/20 V I R wire – 10 coil7/20 V I R wire – 2 coil |
| 26 | OD315115/2025-2026:Hire and labour charges for providing PAS using following accessories etc. complete and giving connection for 8 unit per day for additional days.250w power amplifier -2nos12 cv pre amplifier ? 2 nosBox with matelingtransformer-8nosMicrophone ? 2nos24 v battery with battery charger ? 2nos3/20 V I R wire ? 10 coil7/20 V I R wire ? 2 coil |
| 27 | OD315385/2025-2026: Running charges for 62.5KVA Generator set including supply of fuel |
| 28 | OD315386/2025-2026: Hire and labour charges for providing 62.5 KVA Generator with operator as directed in position and giving connections etc. as required for 2nd day to final day |
| 29 | OD315387/2025-2026: Hire and labour charges for providing 62.5 KVA Generator with operator as directed in position and giving connections etc. as required for 1st day Please Enable Macros to View BoQ information |