| 2 | Detailed topographical survey using Total Station including contours, existing drainage, utilities, and structures and Preparation of survey drawings with Benchmark establishment and referencing and Assessment of grey water generation Collection and laboratory analysis of grey water samples (BOD, COD, TSS, pH, Oil & Grease etc.), Peak flow estimation and future demand projection, Trial pits / boreholes up to required depth for Soil testing (SBC, permeability, classification etc.), Geotechnical investigation report, Design of Grey Water Treatment System, Hydraulic design calculations, Structural design of tanks and allied structures, Electrical & Mechanical design (pumps, blowers, panels etc.), Preparation of detailed drawings, Preparation of Detailed Project Report including design basis, cost estimates, drawings, specifications, rate analysis, Environmental & statutory compliance documentation, Financial analysis (O&M cost, lifecycle cost, sustainability analysis), Submission of 1 hard copy & 1 soft copy of DPR Please Enable Macros to View BoQ information |