| 1 | Providing one Coil Earth using No 8 GI earth wire (50mm dia,115 turns), including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/ structure &back filling |
| 2 | Providing one Earth using earth pipeof size 38.1mm dia2.5m length including digging separate pit at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 6 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing sufficient length of GI earthing leads through all cross arms to ground for earthing (excluding provision of earthing) |
| 7 | Erection of suspension clamp/dead end clamp for 11 kV ABC of any size |
| 8 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 9 | Erection of Anchor clamp for 11 kV ABC of any size |
| 10 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 11 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 12 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 13 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 15 | Providing Cable Tie |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the grounf for earthing excluding provision for earthing |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Additional rate for excavation of Pit for A type pole in hard Laterite |
| 19 | Fitting and providing one HT Fly stay for 11KV Pole using HT PSC pole incl. digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthing (excluding provision for earthing) |
| 20 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 21 | Dismantling and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 22 | Redoing single phase WP service connection complete including lowering down the guy wire portion ,repairing or changing WP wire ,GI wire,Fuseunit etc,changing energymeter cutout,neutral link etc if necessary and reconnecting the same including conveyance of material to site from section office at various location |
| 23 | Providing Strut using LT PSC pole including digging and backfilling pit in ordinary soil |
| 24 | Dismantling (without damage) one km LT additional conductor by dismantling cross arms,insulators and stacking the conductors in rolls properly |
| 25 | Dismantling (without damage) one km LT Sph 2 wire OH line,cross arms,insulators and stacking the conductors in rolls properly |
| 26 | Dismantling (without damage) one km LT 3ph 4 wire OH line,cross arms,insulators and stacking the conductors in rolls properly |
| 27 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole |
| 28 | Erecting one LT PSC pole in position including digging & backfilling pit in ordinary soil |
| 29 | Provding WP support with PSC pole including digging & backfilling pit in ordinary soil excluding transportation of poles |
| 30 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 31 | Fitting one MVT on existing cross arm including 2 nos end termination (for one phase) of any rating for 11 kV AB Cable |
| 32 | Additional rate for excavation of one pit for coil earthing in laterite |
| 33 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 34 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 35 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 36 | Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking the same |
| 37 | Dismantling one section fuse from structure and bringing back to section store |
| 38 | Dismantling one section fuse from the distribution box and bringing back to section store |
| 39 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed .Pole numbers shall be painted in circular/rectangular background using approved quality anti algal yellow paint in two coat after scrapping and cleaning the surface at a height of 2.5 metre above ground level.The number and letters should be in black synthetic enamel.The size of the number should be atleast 2 cm in height x 1.5 cm in width incl cost of paint |
| 40 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 41 | Stringing of 11 kV aerial bunched cable of size 3 x 120 +1 x 95 sqmm with bare/insulated messenger through existing poles |
| 42 | Stringing ,shackling,fitting cross arms,insulators and binding,giving jumper connection etc using ACSR Rabbit for phase and ACSR weasel for Neutral & Street main for one km LT 3 ph 5 wire line including cutting and removing tree branches whereever necessary and conveyance of all materials (except poles) from stacking place |
| 43 | Stringing ,shackling,fitting cross arms,insulators and binding,giving jumper connection etc using ACSR Rabbit for phase & Neutral and ACSR weasel for Street main for one km LT single phase 3 wire line including cutting and removing tree branches whereever necessary and conveyance of all materials (except poles) from stacking place |
| 44 | Stringing ,shackling,fitting cross arms,insulators and binding,giving jumper connection etc using ACSR Rabbit for phase & Neutral for one km LT single phase 2 wire line including cutting and removing tree branches whereever necessary and conveyance of all materials (except poles) from stacking place |
| 45 | Additional rate for excavation of one Pit for HT pole/ HT stay in hard laterite |
| 46 | Transferring LT 3 ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 47 | Transferring LT 3 ph 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 48 | Fitting one no section fuse on LT line with dropping cables , crimping sockets, connecting with Bolt&Nut etc |
| 49 | Additional rate for excavation of one Pit for HT pole/ HT stay in laterite Please Enable Macros to View BoQ information |