| 1 | Construction of Embankment with Material Obtained from Borrow Pits/Right of way Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Lime Treated soil for Sub-Base Providing, laying and spreading soil on a prepared sub-grade, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime with minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to achieve atleast 98 per cent of the max dry density to form a layer of sub-base as per Technical Specification Clause 402. |
| 3 | GSB Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired den . Excluding GST |
| 4 | WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber,, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 5 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 6 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 7 | Providing and applying tack coat with bitumen emulsion (VG-10) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 8 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Excluding GST |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat Excluding GST |
| 10 | Stone Edging Stone edging on both sides of the road of brick class M-150, 8 cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming athe excavated earth as directed by the engineer incharge of the work including material labour & T&P etc for proper completion of work. but bond edging both side and road. SOR No. 766 |
| 11 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. |
| 12 | P.C.C. M-10 Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and technical specification Clauses 802,803,1202, 1203 |
| 13 | Stone masonry work in cement fien sand mortar in foundation complete as per drawing and technical specifications Clause 702,704,1202& 1203 |
| 14 | R.C.C. grade M 25 Sub structure Providing and laying reinforced cement concrete in sub structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 |
| 15 | HYSD Substructure Supplying, fitting and placing HYSD bar reunforcement in substructure complete as per drawing and Technical Specificatins. |
| 16 | Pointing with cement mortar (1:3) on brickwork/ C.R. Stone masonry as per drawing and technical specification Clause 613.3 and 1204 |
| 17 | Plastering with cement mortar (1:4), 15 mm thick on brickwork/ C.R. Stone masonary in substructure as per technical specification Clasuses 613.4 & 1204 |
| 18 | Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106. (600 mm dia Hume Pipe) |
| 19 | Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106.(900 mm dia Hume Pipe) |
| 20 | Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106.(350 mm dia Hume Pipe) |
| 21 | Construction of unreinforced, plain cement Concreet Pavment, thikcness 21cm, overa prepared sub base, with43 grade cemment or any other typeas per M30 coarse and fine aggregates conforming to IS:383, the maximum size of coarse aggregates not exceeding 25mm, ixed in a concrete mixer of not less than 0..2cum capacity and appropriate weigh batcher using approved mixed design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 mmicron thick polythene film, wedges, steel platesincluding levelling the formwork as pper drawing),,spreading the concrete with shovels, raes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joint, curing of concrete slab for 14 days using curing comppound(where specified) and water finishing lines and grade as per drawings and Technical Specification Clause 1501. Please Enable Macros to View BoQ information |