| 1 | Rebore of (300x200mm) Size Tube Well |
| 2 | Transportation From store. |
| 3 | Transportation of Rig Machine |
| 4 | Tansportation of T&P by truck |
| 5 | Loading & Unloading of T&P 22 jobs |
| 6 | Toeing of Air of Compressor T&P tractor |
| 7 | Transportation of comressor T&P by truck |
| 8 | Loading & Unloading of T&P 12 Jobs |
| 9 | Toeing of O.P Unit troll by tractor |
| 10 | Transportaion of O.P Unit T&P |
| 11 | Loading & Unloading of T&p |
| 12 | Return Trip of above T&P. Rig m/c compressor and O.P. Unit |
| 13 | Transportation of Tube well assembly |
| 14 | Loading & Unloading of T.W assembly |
| 15 | Total of Trasportation |
| 16 | Supply of Tube well assembly |
| 17 | 300 mm dia M.S ERW Housing pipe of 7.1 thickness as per IS-3589 |
| 18 | 200 mm dia M.S ERW plan pipe of 7.1 mm thickness as per |
| 19 | 33x200 mm dia MS Reducer |
| 20 | 200 mm dia M.S ERW Slotted pipe of 7.1 mm thickness as per IS-3589 |
| 21 | 300 mm dia M.Socket/ Rings |
| 22 | 200 mm dia MS Socket/Rings |
| 23 | 200 mm mm dia bail plug |
| 24 | 200 mm dia center Guide |
| 25 | 300 mm dia M.S Housing clamp |
| 26 | 300 mm dia M.S. Tube well |
| 27 | 200x100m dia Tube well foundation R.S joint 2.5mt long |
| 28 | Driling of Bore |
| 29 | Erection of RC Rig machine and camp equipage |
| 30 | Drilling of 675 m bore from GL to 90m BGL |
| 31 | Driling of 600 bore from 50M to 90M BGL |
| 32 | Driling of 600 mm bore from 90M to 120M BGL |
| 33 | Driling of 600 mm bore 120M t 150M BGL |
| 34 | Driling of 600 mm bore from 150M to 180M BGL |
| 35 | Dismentling of Rig Machine and T&P after completion of the work |
| 36 | Water arrangement for construction of T.W. |
| 37 | Provision of temporary fencing baricating at T.W.Site for the protection of children, animals and human being by barbered wire during competion of Tube well and dismantling after completion of work |
| 38 | Logging of bore hole by departmental/Approved electric logger |
| 39 | Total of Trasportation |
| 40 | Lowering of Tube well asembly |
| 41 | Lowering of 300 mm dia MS Housing pipe from GL to 40 m BGL |
| 42 | Lowering of 200 mm dia MS Blind/Slotted from 40m to 90 BGL |
| 43 | Same as above but from 90 to 120 M BGL |
| 44 | Same as above but from 120 to 170 M BGL |
| 45 | Total of Trasportation |
| 46 | Supply of 1.6 mm to 4.8 mm size pea gravel LalQuan Quarry |
| 47 | Total of Trasportation |
| 48 | Development of Tube well |
| 49 | Erection of compressor Unit and cap equipage |
| 50 | Dismentling of above after completion of work |
| 51 | Development of Tube well by 600 PSI Capacity air compressor. |
| 52 | Erection of O.P Unit and camp equipage |
| 53 | Dismentling of above after completion of work |
| 54 | Development of Tube well by O.P. Unit |
| 55 | Yield and verticality test of Tube well |
| 56 | Chemical and bacterilogical test of water |
| 57 | Rental charges of Rig Machine air commpressor and O.P. Unit |
| 58 | Site clearance after campletion of T.W. & cutting, welding of well cap after development and earth filling in water pits Please Enable Macros to View BoQ information |