| 1 | Earth Work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water as required complete. SOR PWD (BUILDING) PAGE NO :- 1 , ITEM NO :- 2 (a) |
| 2 | Filling in foundation trenches or plinth with silver sand in layer not exceeding 150 mm as directed and consolidating same by through saturation with water ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity) SOR, PWD (BUILDING), PAGE NO :- 2 , ITEM NO :- 4 A |
| 3 | Single brick flat soiling of jhama bricks including ramming and dressing bed to proper level and filling joint with powered earth or local sand. SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-1, ITEM NO :- 1 |
| 4 | Cement Concrete with graded stone ballast (40 mm size) excluding shuttering in ground floor.(6:3:1) SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-23, ITEM NO :- 1 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth B.S. ITEM NO -08, Page- 15 |
| 6 | 125 mm brick work with 1st classbricks in cement morter ( 1:4) in ground floor. PWD Building Works schedule, Page -16, Item-16, 3rdcori page -3, date -04.06.2018 |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary (ground floor). 15mm thick. (1:6) SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-189, ITEM NO :- 1 |
| 8 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc. SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-192, ITEM NO :- 15 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation SOR, PWD (BUILDING), PAGE NO:-42, ITEM NO :- 36(f) |
| 10 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. a) Pakur Variety SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-24, ITEM NO :- 4 |
| 11 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. SOR PWD (BUILDING) , PAGE:-1, ITEM:-2 |
| 12 | Gr. Floor - |
| 13 | GST 18% |
| 14 | CESS 1% Please Enable Macros to View BoQ information |