| 1 | Construction of Embankment with Material Obtained from Borrow Pits/Right of way Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | GSB Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired den . Excluding GST |
| 3 | Cement treated Grade III Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base. |
| 4 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 5 | Providing and applying tack coat with bitumen emulsion (VG-10) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Excluding GST |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat Excluding GST |
| 8 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. |
| 9 | P.C.C. M-10 Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and technical specification Clauses 802,803,1202, 1203 |
| 10 | HYSD Substructure Supplying, fitting and placing HYSD bar reunforcement in substructure complete as per drawing and Technical Specificatins. |
| 11 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. |
| 12 | Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material in single row including fixing coller with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works in head wall parapets Clause 1106. 350 mm dia Hume Pipe Please Enable Macros to View BoQ information |