| 1 | Removing hard rock by wedging chiselling and trimming to proper shape where blasting is prohibite |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 3 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 4 | Cement concrete 1:4:8 mix ( One cement four sand and eight aggregate) using 40mm ISSmetal including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. |
| 5 | Supplying, erecting mild steel with shuttering using MS sheets stiffened with MS angles, laid over country wood joists and side supported with casurina props for plain cement concrete wall works as directed by the departmental officer etc., complete. |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 7 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) |
| 8 | Vibrated Cement Concrete of grade M20 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for CC Pavement . |
| 9 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification |
| 10 | add GST 18% Please Enable Macros to View BoQ information |