Name of Work:- Construction work of the culvert of the Golden Jubilee Extension Scheme up to Aditya Imperial Apartment
Sl. No.
Item Description
1
Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compaacted to meet requirement of table no, 300-2 Carted earth 8 km.As per MORTH Specification 305/SI No 3.18
2
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 10:5:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work SI NO 274 SOR 2022 page 27
3
Providing & Laying in position of specified grade of reinforced cement concrete with 1:1.5:3 Cement , Coarse Sand and stone gritt 20mm nominal size including the cost of centering shuttering finishing and excluding reinforcement .
4
Mild steel or iron work in plain work such as reinforced concrete brought to required shape as neccesarry including bending for proper completion of the work and including the supply of steel and its waistage bend hook and authorized over lapping shall be measured upto floor to level.
5
Earth work in excavation in foundation trenches in ordinary soil(Loam, Clay or Sand) including laft upto 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches ot into the plinth and rewmoval and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches.SI No 251 UPPWD SOR-2022
6
Cement concrete with 4cm gauge stone ballast, fine sand of 1.25 F.M & cement in propotion of 8:4:1 in foundation & under floors including supply of all materials , labour, tools & plants etc. Required for proper completion of the work SI No 275(a) UPPWD SOR-2022
7
Brick work with common burnt clay F.P.S (non modular) bricks of class Mdesignation -100 class brickwork 1:4 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.1.1 page 30
8
12cm thick plaster with cement and course sand of 1.25 fineness modulus in 1:4 over brick work minimum thickness not be less than 1 cm including supply of all material ,labour tools and plants etc required for proper completion of work.
9
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work.SI No. 279 SOR 2022
10
Construction of Granular Sub Base by providing close graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to acheive the desired density complete As per MORTH Specification 401/SI No 4.1
11
Laying of 80mm I-shaped precast Interlocking tiles of thickness 80 mm.(Compressive strength not less than 30Mpa and weight 4.50 kg ) including 25 mm thick local sand base levelling and dressing of surface to required level and slope filling joint with local sand all complete work.UPPWD SOR-2022 page 70 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.