| 1 | Supply of standard tower as per department approved drawing/design transporting of tower parts to site including sorting out of tower members including transport charges etc complete. |
| 2 | Erection of towers including sorting out of tower members, tightening punching the bolts and nuts, final checking cost of all T&P all lead lifts etc complete. |
| 3 | Earth work excavation in hard Gravelly soil |
| 4 | Earth work excavation in soft disintegratged rock for foundation not requiring blasting |
| 5 | Earth work excavation in medium and dense medium rock requiring blasting for foundation |
| 6 | Earth work excavation in Hard rock requiring welding and chiseling |
| 7 | Earth work excavation in Hard rock requiring control blasting for foundation |
| 8 | Painting M+6 Type towers with one coat red Oxide and Two coats of silver paints of approved quality (2 Towers) |
| 9 | Pole Earthing of Tower with 40mm dia*3mm thickness and 1.8m length GI pipe as per sketch including cost of coal, salt, GI Strip of required length etc |
| 10 | P.C.C 1:3:6 concrete using 40mm HBG metal for foundation without form work but including cost of cement all materials labour, lead, lift etc., |
| 11 | P.C.C 1:2:4, concrete using 12 to 20mm HBG metal with Out form work but including cost of cement all materials labour, lead, lift etc. |
| 12 | P.C.C 1:2:4, concrete using 12 to 20mm HBG metal with form work but including cost of cement all materials labour, lead, lift etc. |
| 13 | Supply of Dead End Clamp 120Sq.mm W/A Type Bolts |
| 14 | Supply of 11KV 3*120 + 1*120 Sq.mm HT AB Cable |
| 15 | Supply of End Termination kit for 120Sq.mm HT AB cable |
| 16 | Labour for End Termination Kit for 120Sq.mm HT AB cable |
| 17 | Fixing of Dead End Clamp 120Sq.mm W/A Type Bolts |
| 18 | Laying of 11KV 3*120 + 1*120 Sq.mm HT AB Cable |
| 19 | Stringing and sagging of 7/4.09mm ACSR conductor (Span Length more than 30mtrs) |
| 20 | Fixing of Tapping Channel Cross Arm |
| 21 | Fixing of 11KV Pin Insulator |
| 22 | Fixing of 11KV Disc |
| 23 | Providing Cradle Guarding Arrangement |
| 24 | Alteration of all Type of Back clamps |
| 25 | Drilling of slot Holes in X Arms & channel |
| 26 | Transporting charges of Line materials from Pocket Store using Private Vehicle up to 30Km |
| 27 | Removing old UG cable Please Enable Macros to View BoQ information |