| 1 | Earth work excavation for foundation in Hard stiff clay, stiff blackcotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil,wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Supplying and fixing in position best quality P.V.C PIPE |
| 3 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standardspecification. |
| 4 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification |
| 5 | Providing and laying ,spreading and compacting 0.396 m3 of 45- 22.40mm & 0.528 m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 6 | Supplying and laying rubberized interlocking paver block M40 grade Providing and levelling of 80mm thick high strength type conforming IS 15658 – 2007 of rubberized interlocking paver lock in size of minimum compressive strength of 40 N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with quarry rubbish cushion below the uniform shap of approved non skidding surface in the top and the rate including levelling the base preparation of pavers as sub base, quarry rubbish cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers, sweeping transporting loading unloading of laying paver block as per standard specification etc.,. |
| 7 | Construction of manholes using sulphate resistant cement at various depths to invert including earth work excavation asperSS20B, laying cement concrete in C.M.1:3:6 using 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M.1:3, 20mm thick and exterior with C.M.1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G. jelly fixing the frame, providing C.I. steps, manhole cover and frame etc. complete for the following sizes for each manhole (As per the type design drawing for manholes). |
| 8 | Raising the existing circular manhole in heavy type including the removing the existing the manhole cover with frame and dismantling the existing the cement concrete wall and tar road surface around the manholes using 1:2:4 20mm jelly for raising the existing the manhole wall an dusing C C1:2:4 with 20mm chips for finishing the top surface of manhole etc., complete. |
| 9 | Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete. |
| 10 | ADD GST 18% Please Enable Macros to View BoQ information |