| 1 | 1.Construction of 10000 lit Capacity OHT 12m Stage at Borewell and Accessories at Sithagampalli AD Colony Village H/O Batlapalli Rs-12.00 Lakhs |
| 2 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart |
| 3 | Second depth of 1m |
| 4 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 5 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers. |
| 6 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers |
| 7 | For items 1.5m to 4.5m below GL |
| 8 | For items 0 to 1.50m below GL |
| 9 | For items 0m to 4.5m above GL |
| 10 | For items 4.51m to 7.32m above GL |
| 11 | For items 7.32m to 10.98m above GL |
| 12 | For items 10.98m to 14.64m above GL |
| 13 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding |
| 14 | PLANE SURFACES |
| 15 | Below G.L. |
| 16 | 3.31m to 4.30m |
| 17 | 6.31m to 7.30m |
| 18 | Curved Surface |
| 19 | 0 to 3.30m from floor level |
| 20 | Square column |
| 21 | Below G.L. |
| 22 | Ground level to 3.30 m |
| 23 | 3.31 to 4.30m |
| 24 | 4.31 to 5.30m |
| 25 | 5.31 to 6.30m |
| 26 | 6.31 to 7.30m |
| 27 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 28 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Departmental officers. |
| 29 | Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c |
| 30 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu |
| 31 | Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by Departmental officers |
| 32 | Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications |
| 33 | 65mm Ø GI pipes for over flow & 1xl |
| 34 | 65mm Ø GI pipes for over flow & 1xl |
| 35 | 50mm Ø GI pipes for scour pipe 1xl |
| 36 | 65mm Ø GI pipe for delivery 1x1 pipe |
| 37 | 90mm Ø PVC Threaded coupler |
| 38 | 65 mm Ø PVC threaded coupler |
| 39 | 65mm Ø GI Tee |
| 40 | 65mm Ø GI 90degree Bend |
| 41 | 65mm Ø GI coupler |
| 42 | 65mm Ø GI union |
| 43 | 65mm Ø GI Elbow |
| 44 | 65x50mm Ø GI Reducer |
| 45 | 75mmx 63mm PVC Reducer |
| 46 | 75mm PVC Threaded coupler |
| 47 | 75x90 PVC Reducer |
| 48 | 75x63 PVC Reducer |
| 49 | 65mm Ø GM Gate valve |
| 50 | 50mm Ø GM gate valve |
| 51 | 50mm Ø GI coupler |
| 52 | Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers. |
| 53 | Provision For Bore Well |
| 54 | Geophysical investigation charges including preparation of Geophysical survey reports etc., all complete |
| 55 | Drilling of 150mm dia borewell in hard rock area including development charges and labour charges for errection of casing pipes in over burdern soil etc complete |
| 56 | Drilling of 150mm dia borewell in Upto 150mt BGL |
| 57 | Supply and delivery of OD PVC casing pipe1 |
| 58 | Supply & delivery of 160mm PVC End cap |
| 59 | Cost of 7.5HP 50lpm x 2 50m Sub merisible motor |
| 60 | Cost of 7.5HP Pannal Board for Sub merisible motor |
| 61 | Supply & delivery of 1.1KV grade 3 core pvc insulated 4 sqmm copper submersible cable as per ISI |
| 62 | Labour charges for errection charges of 7.5HP Submersible pumpset with GI pipes in the deep borewell including connection of Submersible cable etc complete |
| 63 | Transportation & Conveyance charges of power pump set to the site |
| 64 | 40mm GI Pipe |
| 65 | 50mm GI bend |
| 66 | 50MM ClampSet |
| 67 | 50MM Nrv |
| 68 | 50MM Gi Nipple 0.60M |
| 69 | 63Amps Procleain fuse unit |
| 70 | 63MM HDPE PN6 |
| 71 | UG CABLE |
| 72 | kiosk box with pedesaral |
| 73 | EB DEPOSIT |
| 74 | Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, stiff black cotton soil, Hard red warth shales, murrams and earth mised with small size in various classification of soil confirm to SS 20B for narrow pipeline trench of size D1.05xB0.6xLength including the cost of PVC pipes laying and jointing labour charges fo refilling of excavated earth etc., all complete |
| 75 | Towards Labour Charges for Laying and jointing including all labour charges etc complete |
| 76 | Refilling the trench with excavated earth other than sand including all labour charges etc complete |
| 77 | Provision For Chlorination |
| 78 | Provision For Soak Pit Arrangements |
| 79 | Provision For Cutstone |
| 80 | Provision For Name Board |
| 81 | Provision For Photo Charges |
| 82 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |