| 1 | Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, T & P., etc. complete. |
| 2 | Dismantling the existing Aluminium Partition from the site as directed by the engineer at site including cost of all labours, lead, lift, tools & plants, etc. complete. |
| 3 | Brick work in CM 1:5 using fly ash bricks including plasticizer at the rate of 100 ml per bag of cement, cost of all materials, labours, lead, lift, curing, etc. complete. |
| 4 | Providing centering and shuttering for RCC works upto 3m heights using M.S. sheets of size 90 x 60 cm with BG 10 guage stiffened with welded M.S. angles of size 25 x 25 x 3 mm laid over silver oak scantlings of size 10 x 6.50 cm at 90 cm c/c & supported by casurina props 10 to 13 cm. dia at 75 cm c/c complying with standard specifications including cost of all materials, labours, lead, lift, etc. complete. |
| 5 | Supplying & providing Steel Reinforcement rods including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete. |
| 6 | Providing RCC 1:1.5:3 with 12 to 20mm machine crushed HBG metal including plasticiser at the rate of 100 ml per bag of cement, cost of all materials, labours, lead, lift, curing, etc. complete but excluding cost of reinforcement and form work. |
| 7 | Plastering in walls with C.M 1:5, 12 mm thick including plasticizer at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc. complete. |
| 8 | Colour washing two coats with shell lime, colouring pigments & DDL fevicol binder at the rate of 250 gm. per 10 kg bag of lime including cost of all materials, labours, lead, lift, scaffolding, etc. complete. Please Enable Macros to View BoQ information |