Name of Work:- Construction of Paver block at ward No.20 Nellithurai Mann athi (SF.No.1368) in kottur Town panchayat
Sl. No.
Item Description
1
Earth work excavation for foundation and deposting on bank with initial lead of 10m& intial lift of 2m in hard stiff clay, stiff black cotton, hard red earth shales ,murram, gravel, stoney earth mixed with small size boulders etc completed as per std specification.SS 20B
2
Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges etc., complete as per standard specification
3
Centering for sides and soffits of R.C.C Slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to site and labour charges for centering and structing upto 3.00 m height etc. complete. Complying with std specifications
4
A)Side wall
5
Plain Cement Concrete 1:2:4 Mix (one part cement, Two part Msand and four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications.
6
Construction of WMM by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
7
Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 63mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, stone dust cushion 100mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.