| 1 | Construction of Bridge in Athikovil near chitraru at Khansapuram Village and Panchayat in Watrap Block at Virudhunagar District (VNR25RUR031) SPECIAL AREA DEVELOPMENT PROGRAMME SADP - 2025 26 |
| 2 | Dismantling of Existing Structures like culverts, bridges and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. |
| 3 | Removal of Existing RCC Retaining Wall |
| 4 | For RCC Retaining Wall |
| 5 | Earthwork Excavation in Loose Boulders Not Requirig Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. |
| 6 | Earthwork Excavation in Loose Boulders Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (Open Foundation, Cutoff Wall) Under Abutments, Returns & Piers Below Sill Level. |
| 7 | Vibrated Cement Concrete of Grade M15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Levelling course Below Footing, Below Raft Foundation, Below Retaining Wall). |
| 8 | Vibrated Plain Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing Under Abutments, Returns & Piers. |
| 9 | Vibrated Plain Cement Concrete of Grade M20 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Sub structure of Abutment, Pier & Wing Wall Above Sill Level. |
| 10 | Vibrated Reinforced Cement Concrete of Grade M30 using 20 & 12mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Dirtwall and Bedblock. |
| 11 | Providing and Fixing Seepage Pipes of 100mm dia PVC Pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm Dia Semi spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the Backfill in Between Abutments and Returns. |
| 12 | Providing and Fixing Kraft Paper for full width of seating of deck slab and including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete. |
| 13 | Vibrated Reinforced Cement Concrete of Grade M30 using 20 & 12mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Deck Slab & Kerb. |
| 14 | Providing Filter Media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges \\"Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete. |
| 15 | Filling Behind Abutments and Wings with Clean Gritty Gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for Filling Behind the Abutment and Wings. |
| 16 | Providing & Fixing PVC Expansion joint in between Deck Slab over Abutment & Piers as shown in the drawing including cost & conveyance of Expansion Joint including Shalimar Pad and Joint sealant etc., complete. |
| 17 | Vibrated Cement Concrete of Grade M15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Basecoarse Below Approach Slab. |
| 18 | Vibrated Reinforced Cement Concrete M30 Grade, using 20mm & 12mm ISS size HBG Metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for Approach Slab. |
| 19 | Vibrated Cement Concrete M30 using ISS Size HBG Graded Metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing Coat of 75mm Uniform Thickness Over Deck Slab and Approach Slab. |
| 20 | Vibrated Reinforced Cement Concrete of Grade M40 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Crashbarrier. |
| 21 | Vibrated Cement Concrete M20 Grade using 40mm, 20mm & 12mm ISS Size Hard Granite Broken Metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights for Parapet Wall over Wings. |
| 22 | Providing and Fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc, complete. |
| 23 | Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., [including Wastage 5%] complete, Fe.500 Grade. |
| 24 | Cost of Bridge Portion |
| 25 | Approach Road |
| 26 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for Formation. |
| 27 | 98% Compaction |
| 28 | 100% Compaction |
| 29 | Collection and Supply of Gritty Gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, For SHOULDERS. |
| 30 | Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III. |
| 31 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 225mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 225mm thick with pavers in SubBase / Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 32 | Providing and Laying of Prime Coat using Emulsion at the rate of 7 Kg per 10 Sqm over the WMM Surface preparatory to another Bituminous construction over it. |
| 33 | Providing and Laying Tack Coat Over WMM Surface (Treated with Primer) using 2.5Kg of Bitumen Emulsion RS-1 for 10 Sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 34 | Providing and Laying Bituminous Concrete to 25mm thick using 0.13 Cum of 19.00 - 9.50mm, 0.17 Cum of 9.50 - 2.36mm and 0.26 Cum of 2.36 and below with 50.30 kgs of VG30 Bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of Morth Rev-5. |
| 35 | Cost of Approach Road |
| 36 | Diversion Road |
| 37 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for Formation. |
| 38 | 98% Compaction |
| 39 | Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 GSB-III. |
| 40 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 100mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 100mm thick with pavers in SubBase / Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 41 | Providing and Laying Reinforced Cement Concrete Pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry. |
| 42 | SUB ESTIMATE (FOR PCC RETAINING WALL) |
| 43 | Earthwork Excavation in Loose Boulders Not Requiring Blasting Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation Under Retaining wall. |
| 44 | Vibrated Cement Concrete of Grade M 15 using 40mm, 20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for (Below Retaining Wall). |
| 45 | Vibrated Plain Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing of Retaining Wall. |
| 46 | Vibrated Cement Concrete of Grade M20 using 40mm, 20mm & 10mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for Stem of Retaining Wall. |
| 47 | Providing and Fixing Seepage Pipes of 100 mm dia PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the Backfill in Between the Abutments and Returns. |
| 48 | SUB ESTIMATE (FOR APRON) |
| 49 | Earthwork Excavation in Loose Boulders Not Requiring Blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Foundation of Rigid Aprons. |
| 50 | Vibrated Cement Concrete of Grade M 15 using ISS 40mm, 20mm & 10mm Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Rigid Apron. |
| 51 | Vibrated Plain Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Rigid Apron. |
| 52 | Vibrated Cement Concrete of Grade M 20 using 40mm, 20mm & 10mm ISS Size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications Cut Off Wall. |
| 53 | SUB ESTIMATE ESTIMATE [WHITE WASHING & PAINTING] |
| 54 | Whitewashing of Abutments, Piers & Wing Walls using two Coats of Freshly Burnt Shell Lime |
| 55 | Plastic Emulsion Painting for Crashbarrier and Handrails using two coats of Enamel Paint. |
| 56 | Provision for Sign Board |
| 57 | Provision for Reflectors |
| 58 | GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |