| 1 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means |
| 4 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. |
| 5 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 6 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 7 | Supply and Fixing of Gate Light Luminaries Shall have 15W.The Luminaries have diecast SS Body power Coared Surgeprotected up to 6kv Efficient of the Luminaries shall be S90lm/w including to cable work service and erection work etc., as specified by the de |
| 8 | Supply & Fixing of 200Watts 6num L.E.D energy savings Technology aluminium casting body( with dust and dusk) with non corrosive material and acrycle Cover also given.Including cost and conveyance of meterials and all labour charges etc complete as per sta |
| 9 | Supply and Erection of granite stab benches(3 Seater) including cost for brick work withplastering for benches pillar and laying 75mmthick RCC precast slab for sitting portionand laying over granite slab of 25mm thickfor sitting portion of size 1.80×0.50m,including cost of all materials and labourCharges for fixing in position etc. complete. |
| 10 | Supply and installation of Rope Climber Tent fixed in the ground with 40 mm galvanised iron pipe b class pipe fram with a cross bar of 50 mm galvanised iron pipe of b class welded with clamps made up of 12 m.m dia mild steel rods welded on the outer side. |
| 11 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 12 | Supply, Fixing & commissioning of Pop up spray RD 1804 SAM PRS Series Spray bodies with high efficiency HE VAN Nozzle capable of covering radius of 0.9-4.6m at 1.0 - 2.1 Bars, pressure with Matched precipitation rate, tactile click and DU > 0.7. Triple Blade Wiper Seal precisely balances flushing, flow- by and debris protection to optimize performance and durability at pop- up and retraction. Precision-controlled flushing at pop-up and retraction clears debris, ensuring positive stem retraction in all soil types. Unique debris pockets hold grit in place, removing it from circulation and preventing long-term damage. Parts resistant to corrosion in treated recycled water containing chlorine. Pop spray body shall with stand upto 6.9 bar. Built-in Seal-A-Matic™ (SAM) check valve. Traps water in lateral pipes in elevation changes of up to 14 feet (4.2 m). PRS Maintains constant outlet pressure at 30 psi or 45 psi at varying inlet pressures. etc., RD1804- SAM PRS-HE VAN incl installation charges. (HC-W0344 ) |
| 13 | Provision for GST 18 % 32mm Pipe Please Enable Macros to View BoQ information |