|
| 1 | Temporary Civil Works |
| 2 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0\\" min. ht.) roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area). |
| 3 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0\\" min. ht.) Roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area) |
| 4 | Addotional rate for Item - 2 ( Above 6 to 10 days , 10% ) |
| 5 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0\\" ht. Min.) as per direction. Roof should be projected upto 2'0\\" from all walling (Payment will be made as per floor area). |
| 6 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0\\" from all walling (Payment will be made as per floor area). |
| 7 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo salbullah frame resting on strong salbullah as per requirement and direction including maintenance as required (upto 10'0\\" min. ht.) roof should be projected upto 2'0\\" from all walling. (Payment will be made as per floor area). |
| 8 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. |
| 9 | Walling with water proof tarpaulin/hessian without bamboo/sal framing and post complete. |
| 10 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). |
| 11 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). |
| 12 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0\\" to 10'0\\" ht.). |
| 13 | Addotional rate for Item - 8a ( Above 16 to 20 days , 20% ) |
| 14 | Walling with clean G.C.I. Sheets without bamboo/sal frame and post complete as per direction (8'0\\" to 10'0\\" ht.). |
| 15 | Fitting, fixing in position of collapsible gate (on hire basis) as per direction.(Payment will be made as per opening length). |
| 16 | Hire and labour charges for bamboo barricading with sal post of 4\\" dia @4' c/c including necessary frame works complete upto 3'0\\" to 4'0\\" ht with 3 rows. |
| 17 | Making of wooden platform upto 1'0\\" ht. Including supply of wooden planks and necessary frame works with post as per direction (Restricted item). |
| 18 | Supplying and laying of tarpaulin as per direction. |
| 19 | Addotional rate for Item - 12 ( Above 16 to 20 days , 20% ) |
| 20 | Supplying and laying of Coir Mat as per direction. |
| 21 | Supplying and laying of Carpet (good quality) as per direction. |
| 22 | Addotional rate for Item - 2 ( Above 6 to 10 days , 10% ) |
| 23 | Making of square or hexagonal mesh netting with wooden frame and bamboo / wooden post as per direction upto 3'0\\" ht. |
| 24 | Gap covering with wooden planks including framing works complete as per direction. |
| 25 | Addotional rate for Item - 16 ( Above 16 to 20 days , 20% ) |
| 26 | Making of temporary latrin with necessary arrangement for urinal and WC side covering with polythene sheets. A. Urinal |
| 27 | B. W.C. (Inbuilt) |
| 28 | Making of watch tower at counting venues as per drawing attached with all materials and labour complete. |
| 29 | Supplying and fixing in position of door/window curtain. |
| 30 | Making of EVM racks as per drawing and direction including hiring charges of local woods supplying of all other necessary materials and labour complete. |
| 31 | Addotional rate forItem no-20 ( Above 21 days & above , 25% ) |
| 32 | Hire and labour charges for providing 'Drop Gate' with 15cm. Dia. Salbullah of length not less than 8 mtr. Including hoisting and fitting fixing with bolts and nuts to vertical post (100 mm dia 2 nos. of each flank embedded 750 mm below ground level) and providing counter load of concrete or stone or iron block at the fulcrum end including painting 2 coats in alternate band providing 'stop' plate, jute rope of necessary length etc. complete including dismantling and remove as per direction. |
| 33 | Making of display board with local wood and ply board of size 3'0\\"x2'0\\" with display matters. A. With Stand |
| 34 | B. without Stand |
| 35 | Making of display board with local wood and ply board of size 4'0\\"x3'0\\" with display matters. A. With Stand |
| 36 | B. without Stand |
| 37 | Hire charges of wooden table on hire basis of size 5'0\\"x3'0\\". |
| 38 | Addotional rate for Item no-24 ( Above 16 to 20 days , 20% ) |
| 39 | Hire charges of wooden table on hire basis of size 4'0\\"x2.5'0\\". |
| 40 | Hire charges of wooden table on hire basis of size 3'0\\"x2'0\\". |
| 41 | Hire charges of Row table with sun mica top of 6'0\\" length on hire basis. |
| 42 | Hire charges of Coushion chair. |
| 43 | Hire charges of Garden chair. |
| 44 | Hire charges of Polythene chair. |
| 45 | Hire charges of Sataranchi (Dori) on hire basis on standard size 15'0\\"x12'0\\". |
| 46 | Hire charges of clean and washed G.I..Polythene drum with cover for drinking water. |
| 47 | Hire charges of Polythene jug. |
| 48 | Hire charges of Polythene glass. |
| 49 | Hire charges of single Sofa. |
| 50 | Hire charges of double Sofa. |
| 51 | Hire charges of Centre table of standard size. |
| 52 | Hire charges of folding cot with bed roll on hire basis. |
| 53 | Hire charges of clean white table cloth. |
| 54 | Hire charges ofCeramic flower vase. |
| 55 | Hire charges of wooden low bench. |
| 56 | Hire charges of plastic bucket with lid . |
| 57 | Hire charges of bed roll with toshak, pillow and bed sheet. |
| 58 | Hire charges of big size polythene drum for making waste paper basket. |
| 59 | Construction of temporary Booth covered with waterproof tarpaulin/ corroguted (G.C.I. ) shed with over roof with strong bamboo/ sal bullah frame resting over strong sal bullah post including necessary lighting arrangement etc. as per direction of EIC. |
| 60 | Repairing of wooden door and window by replacing wooden plank jointing the necessary batten complete in all respect. |
| 61 | Supplying E.C. Bullah and labour charges for acissors baricating with 75 to 100 mm. Dia. Resting over the bullah post including necessary binding with wire or rope as per direction of EIC |
| 62 | Supply of Daily labour ( As per Schedule Rate inclusive of 10 % Contractors profit & 1% Labour cess ) |
| 63 | 75 mm. thick brick work with 1st class bricks set in cement, sand mortar (1:4) in ground floor including H.B. netting in every alternate layers. |
| 64 | Supplting & setting of CourseSand bag for Baricating purpose of CRPF ( Inclussive cost of Sand bag ) |
| 65 | Supplying & Labour for laying soiling with bricks including carriage of bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled inandpackedwith local sandor powdered earthand including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used) Please Enable Macros to View BoQ information |