| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. BCD 5.1.1 |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) BCD 5.1.10 |
| 3 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. BCD 5.6.3 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) BCD 5.3.1.3 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5.3(1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) BCD 5.3.1.1 |
| 6 | Providing designation 75A brick work in C.M (1: 6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I.BCD 5.2.3 |
| 7 | Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete.1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) BCD 5.3.9.1 |
| 9 | Centering and shuttering including strutting, propping etc. Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. BCD 5.3.17.2 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for foundation footing , base of Column etc. for mass concrete. BCD 5.3.17.1 |
| 11 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} BCD5.5.5 a |
| 12 | Carriage of Matarial Cement |
| 13 | Stone Chips |
| 14 | Brick |
| 15 | Good and Services Taxes @ 18% |
| 16 | Labour Cess @ 1% Please Enable Macros to View BoQ information |