| 1 | Original survey, preparation & submission of profilesin 4 copies including excavation in any type of soil up to 3.00mtr. Of depth for trial pits 2 nos of such pits in 1km length & providing pre cast permanent concrete blocks / stones of 600mm X 300mm X 100mm on each deviation point on entire line with chain age painted on it.The work includes excavation of trial pit of 1 x 1 x 3mt in any type of soil for classification of the said pit. The rate is inclusive of back filling of the pits so excavated after classification of soil for foundation. |
| 2 | Check survey along with plotting of line route on mapwith coordinates including detailed survey, preparation of profile and revision in original route alignment, if any and as per instruction Engineer-in-charge. |
| 3 | Excavation excluding back filling but including shoring shuttering, dewatering, tree cutting for tower footings etc for :- a) Black cotton submurged/marin soil where dewatering is necessary |
| 4 | Installation of steel reinforcement in concrete foundation including supply of MS bars, binding wire and their cutting bending, binding, and laying in position as per drawing |
| 5 | Stub-setting including back filling but excluding excavation and concreting etc for all types of towers/extensions except special towers (Weight of stub, cleat and template with bolt and Nuts of stub and template shall be counted (1Mtr rised Chimany) |
| 6 | Concreting of foundation by M25 mixture including shoring, shuttering,dewtering etc for normal tower/tower with extension . |
| 7 | Grounding of towers with pipe type earthing including excavation and back filling and supply of all materials like 32mm dia heavy duty 3mtr long G.I Pipe and 50 x 6mm GI flat,bolt -nuts, salt, coal/charcoal etc as per drawing |
| 8 | Erection of super structure upto 6 meter extension including tree cutting , fixing of tower accessories , attachments except ACD/DP/NP/CIP/PP and excluding tack welding of bolts. This includes taking delievery of tower materials and bolt nuts for normal , extension and special towers at destination and keeping them in safe custody and transporting the same to erection site |
| 9 | Stringing of OPGW including laying , jointing , tensioning , clamping with accessories as per CEA rules |
| 10 | Stringing of TACSR 06 (Six) conductors for double circuit including laying, jointing, tensioning, clamping with armour rods, hoisting of insulator stringing, fixing of jumpers, dampers etc and with required tree cutting on entire length for adequate clearances/safe charging of line |
| 11 | Fixing of Anti climbing devices including supply of barbed wire (except speical tower) a) 66KV |
| 12 | Fixing of DP/NP/PP/CIP including supply of plates and supply of GI bolts nuts and tack welding as per drawing |
| 13 | Tack welding of nuts up to approx 10 mtrs height or two bottom most panel from ground level at three places on the nuts diametrically and applying zinc rich paint immediately after tack welding |
| 14 | Dismantling of conductors and line materials of existing line with 6 (six ) Panther conductors |
| 15 | TOWER MATERIALSupply of HDGI materials for new tower. |
| 16 | Supply of HDGI bolt nuts with wisher for new tower. |
| 17 | Supply of High capacity conductor TACSR (Thermal-resistant Aluminum-alloy Conductor Steel Reinforced) of 160 SQ. MM , TAL 30/2.60mm + ST 7/2.60 mm, Confirm to relevant IEC specification i.e AL alloy wire IEC 62004, GI wire IEC 60888 and Fabrication and testing IEC 61089 amended up to date, Conductor comparable of 0.2 ACSR PANTHER conductor current carring capacity above 700 Amps at temperature of enhance the transmission capacity. MAKE: APAR/Transrail/Sterlight |
| 18 | Supply of 120 KN Disc Insulator (66KV Polymeric)String |
| 19 | Supply of Single Tension Hardware for TACSR 160 SQ. MM conductor. |
| 20 | Supply of Vibration Damper for TACSR 160 SQ. MM conductorr |
| 21 | Supply of Jumper Cone for TACSR 160 SQ. MM conductorr |
| 22 | OPGW CABLE & HARDWARESupply of OPGW wire 48 fiber |
| 23 | Supply of OPGW Tension Hardware |
| 24 | Supply of Joint for OPGW |
| 25 | Supply of bird guard (Set of Three) |
| 26 | Copper earth bond |
| 27 | Supply of Anticlimbing Device Please Enable Macros to View BoQ information |