Name of Work:- Work of Safety Audit, HIRA Analysis, HAZOP Study, LOPA Study, MCLS Study & Safety Report at Bhandup Complex.
Sl. No.
Item Description
1
Conducting External Safety Audit as per IS 14489:2018 and as per Safety Audit Rule 2024 through DISH approved institute of safety auditors and prepare On-site Emergency Exit Plan.
2
Compliance Verification Audit.
3
Preparation of Risk Analysis (HIRA) of factory as per 73L 5(e) of Maharashtra Factory Rules 1963 & BIS Code 15656:2006 and submitting the report.
4
Preparation of HAZOP Study and submitting the report as per statutory requirement.
5
To carry out LOPA Study as per P & ID and entire processes & storage system of the plant.
6
Preparation of Maximum Credible Loss Scenerio (MCLS) and submitting the report.
7
Preparation of Safety Report as per Rule 9 of Maharashtra Factories (Control of Industrial Major Accidents Hazards) Rule 2003 & submission of report. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.