Name of Work:- Construction of Shandy (Roofing Sheet with Platorm) (Shed - 1) at Embal in Embal Panchayat
Sl. No.
Item Description
1
Construction of Shandy (Roofing Sheet with Platorm) (Shed - 1) at Embal in Embal Panchayat
2
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
3
Filling with M Sand including cost and Conveyernce and all charges compacted,etc., complete
4
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite tone jelly for foundation including all charges compacted,etc., complete
5
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
6
Supply and Fabrication of Steel including cost and conveyance of all materials to work site and all labour charges etc.complete
7
CC 1:2:4 Mix unsing 20mm ISS metal including cost and conveyance of all materials to work site and all labour charges etc.complete
8
RCC 1:2:4 Mix unsing 20mm ISS metal including cost and conveyance of all materials to work site and all labour charges etc.complete
9
Supply and Fixing of 65mm dia GI Pipe including cost and conveyance of all materials to work site and all labour charges etc.complete
10
Supply and Fixing of Mild steel rectangular tube sectio for reepers including cost and conveyance of all materials to work site and all labour charges etc.complete
11
Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
12
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 1 & 11 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.