| 1 | Schedule A-1(For Imported items) |
| 2 | Schedule A-2(For indigenous items) |
| 3 | Schedule A-3 (Erection of cable and its accessories) |
| 4 | Schedules A-4 (Civil works) |
| 5 | GST @ 18% |
| 6 | 110KV,1x630sq.mm,Alu XLPE cable (RL:2.2 Kms) |
| 7 | 110KV Straight Through Joints |
| 8 | 110KV Insulated Joints |
| 9 | 110KV Outdoor Termination kit |
| 10 | 110 KV Outdoor Termination Structure with spring loaded clamp. |
| 11 | 110kV LAS without support structure |
| 12 | 110 kV LAS Structure |
| 13 | 110 kV Single phase link box without CCPU at both SS end |
| 14 | 110 kV Single phase link box with CCPU at Insulated joint end |
| 15 | 6.35/11kV 400Sq.mm Sheath Bonding cable |
| 16 | Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories. |
| 17 | Providing Warning Tape |
| 18 | Earthing and sundries |
| 19 | 110KV,1x630sq.mm,Alu Cable (RL:2.7 Kms) |
| 20 | 110KV Straight Through Joints |
| 21 | 110KV Insulated Joints |
| 22 | 110KV Outdoor Termination kits |
| 23 | 110 KV Outdoor Termination Structure with spring loaded clamp. |
| 24 | 110kV LAS without support structure |
| 25 | 110 kV LAS Structure |
| 26 | 110 kV Single phase link box without CCPU at both SS end |
| 27 | 110 kV Single phase link box with CCPU at Insulated joint end |
| 28 | 6.35/11kV 400Sq.mm Sheath Bonding cable |
| 29 | Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories. |
| 30 | Providing Warning Tape |
| 31 | Earthing and sundries |
| 32 | 110 kV, 1X630 sq.mm, XLPE Al. cable. (Circuit length (2.6x3x2=15.6 KM) |
| 33 | 110 kV Normal Straight joint |
| 34 | 110 kV Insulated joint |
| 35 | 110 kV Outdoor termination |
| 36 | 110 kV Outdoor termination Structure |
| 37 | 110 kV LAS with surge monitor and all accessories |
| 38 | 110 kV LAS Structure |
| 39 | 110 kV Single phase link box without CCPU |
| 40 | 110 kV Three phase link box with CCPU |
| 41 | 6.35/11 kV,400 sq.mm Cu Sheathbonding cable. |
| 42 | 48 Core (ADSS) Optic Fibre Cable along with HDPE pipe, FODB Patch cord, Splicing box including all accessories. |
| 43 | Earthing works |
| 44 | 110KV,1x630sq.mm,Alu XLPE cable (RL:2.2 Kms) |
| 45 | 110KV Straight Through Joints |
| 46 | 110KV Insulated Joints |
| 47 | 110KV Outdoor Termination kit |
| 48 | 110 KV Outdoor Termination Structure with spring loaded clamp. |
| 49 | 110kV LAS without support structure |
| 50 | 110 kV LAS Structure |
| 51 | 110 kV Single phase link box without CCPU at both SS end |
| 52 | 110 kV Single phase link box with CCPU at Insulated joint end |
| 53 | 6.35/11kV 400Sq.mm Sheath Bonding cable |
| 54 | Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories. |
| 55 | Providing Warning Tape |
| 56 | Earthing and sundries |
| 57 | 110KV,1x630sq.mm,Alu Cable (RL:2.7 Kms) |
| 58 | 110KV Straight Through Joints |
| 59 | 110KV Insulated Joints |
| 60 | 110KV Outdoor Termination kits |
| 61 | 110 KV Outdoor Termination Structure with spring loaded clamp. |
| 62 | 110kV LAS without support structure |
| 63 | 110 kV LAS Structure |
| 64 | 110 kV Single phase link box without CCPU at both SS end |
| 65 | 110 kV Single phase link box with CCPU at Insulated joint end |
| 66 | 6.35/11kV 400Sq.mm Sheath Bonding cable |
| 67 | Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories. |
| 68 | Providing Warning Tape |
| 69 | Earthing and sundries |
| 70 | 110 kV, 1X630 sq.mm, XLPE Al. cable. (Circuit length (2.6x3x2=15.6 KM) |
| 71 | 110 kV Normal Straight joint |
| 72 | 110 kV Insulated joint |
| 73 | 110 kV Outdoor termination |
| 74 | 110 kV Outdoor termination Structure |
| 75 | 110 kV LAS with surge monitor and all accessories |
| 76 | 110 kV LAS Structure |
| 77 | 110 kV Single phase link box without CCPU |
| 78 | 110 kV Three phase link box with CCPU |
| 79 | 6.35/11 kV,400 sq.mm Cu Sheathbonding cable. |
| 80 | 48 Core (ADSS) Optic Fibre Cable along with HDPE pipe, FODB Patch cord, Splicing box including all accessories. |
| 81 | Earthing works |
| 82 | Erection & company supervision charges of 110 kV Straight Through joints |
| 83 | Erection & company supervision charges of 110 kV Insulated joints |
| 84 | Erection & company supervision charges of 110KV OD Termination including structure |
| 85 | Erection & company supervision charges for 110KV LAS including structure |
| 86 | Erection & company supervision charges of ADSS splicing,termination end FODB |
| 87 | Transporting of 110 kV 1X630 Sq.mm XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch ,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete. |
| 88 | Providing watch and ward (Unskilled) at site as instructed site-in-charge. |
| 89 | Erection & company supervision charges of 110 kV Straight Through joints |
| 90 | Erection & company supervision charges of 110 kV Insulated joints |
| 91 | Erection & company supervision charges of 110KV OD Termination including structure |
| 92 | Erection & company supervision charges for 110KV LAS including structure |
| 93 | Erection & company supervision charges of ADSS splicing,termination end FODB |
| 94 | Transporting of 110 kV 1X630 Sq.mm XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch ,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete. |
| 95 | Providing watch and ward (Unskilled) at site as instructed site-in-charge. |
| 96 | Erection & supervision charges of 110 kV straight joints and Insulated joints |
| 97 | Erection of 110 kV Outdoor termination and terminal connectors including Link box, Spring loaded clamps & Earthing arrangements |
| 98 | Erection & Supervision charges for 110 kV Lightning arrestor with Structure earthing |
| 99 | Erection,and Laying of ADSS 48 FO cable including Splicing, termination and FODB,patch card with accessories |
| 100 | Transporting of 110 kV 1X630 Sq.mm XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete. |
| 101 | Providing watch and ward (Unskilled) at site as instructed site in charges |
| 102 | Removing the black topping of any thickness and forming cable duct at road crossing including cost of providing sign board,danger lights, indication arrengements wherever neceessary lead lift, labour and all mtools & plants etc. complete. |
| 103 | Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60cm wide and 150cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete including bailing out of water. |
| 104 | Dismantling clearing away carefully the materials irrespective of thickness of Brick masonry inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete |
| 105 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from P.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete |
| 106 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead, lifts, labour, tools and Plants , complete. |
| 107 | Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. |
| 108 | Back filling with excavated earth in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. |
| 109 | Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete. |
| 110 | Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification. |
| 111 | Supplying and laying 160mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete. |
| 112 | Supplying and laying 110mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete. |
| 113 | Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete. |
| 114 | Providing joint chamber BW in CM 1:6 using second class chamber burnt bricks including cost of all materials labour lead lift curing etc complete. |
| 115 | Plastering with CM 1:5, 12 mm thick for joint bay chamber wallls including cost pf all materials labour lead lift curing etc complete. |
| 116 | Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete. |
| 117 | Casting & placing of RCC offset slab of size 750 x750 x 60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement, piling, shuttering, curing, transport from castingpiling, shuttering, curing, transport from casting yard to various locations & fixing the slab along 110 KV cable route as directed by the Engineer incharge with PCC 1:3:6 including cost of all materilas, labour, lessd, lift, etc., including 2 coats of flouresecent paint. |
| 118 | Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site. |
| 119 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete |
| 120 | Laying M20 Ready Mix Concrete for RCC work for Canal Crossing,ODT & LAS plinths and wherever required using 20mm down graded HBG metel for ducts as per standard specification including cost of steel, all materials lead, lift, labour, for laying concrete, curing, etc., complete. |
| 121 | Trenchless crossing including cost of pipe -Horizontal directional drilling -Supplying and laying of HDPE pipe of 200 mm dia wall thickness 10mm(PE100 grade-PN10),6 Kg per cm2 with spigot and socket end by trench less method 2.5m to 3m below the ground level in all soil including shoring and shuttering and driving the horizontal bore by ( trenchless technology method) without affecting any highway installations and other service lines. The rate includes the provision of drive pit, entry pit, exit pit as required and removing the soil from the pipe, cost of jointing the pipe with fusion method tying and providing 7/20 SWG GI wire inside the pipe and closing the ends by end cover etc. complete or by any other suitable method as the site condition may warrant as approved by the Engineer at site. All the tools and plants ie machinery, labour and materials are to be provided by the contractor/ tenderer) . |
| 122 | Removing the black topping of any thickness and forming cable duct at road crossing including cost of providing sign board,danger lights, indication arrengements wherever neceessary lead lift, labour and all mtools & plants etc. complete. |
| 123 | Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60cm wide and 150cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete including bailing out of water. |
| 124 | Dismantling clearing away carefully the materials irrespective of thickness of Brick masonry inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete |
| 125 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from P.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete |
| 126 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead, lifts, labour, tools and Plants , complete. |
| 127 | Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. |
| 128 | Back filling with excavated earth in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. |
| 129 | Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete. |
| 130 | Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification. |
| 131 | Supplying and laying 160mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete. |
| 132 | Supplying and laying 110mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete. |
| 133 | Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete. |
| 134 | Providing joint chamber BW in CM 1:6 using second class chamber burnt bricks including cost of all materials labour lead lift curing etc complete. |
| 135 | Plastering with CM 1:5, 12 mm thick for joint bay chamber wallls including cost pf all materials labour lead lift curing etc complete. |
| 136 | Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete. |
| 137 | Casting & placing of RCC offset slab of size 750 x750 x 60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement, piling, shuttering, curing, transport from castingpiling, shuttering, curing, transport from casting yard to various locations & fixing the slab along 110 KV cable route as directed by the Engineer incharge with PCC 1:3:6 including cost of all materilas, labour, lessd, lift, etc., including 2 coats of flouresecent paint. |
| 138 | Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site. |
| 139 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete |
| 140 | Laying M20 Ready Mix Concrete for RCC work for Canal Crossing,ODT & LAS plinths and wherever required using 20mm down graded HBG metel for ducts as per standard specification including cost of steel, all materials lead, lift, labour, for laying concrete, curing, etc., complete. |
| 141 | Trenchless crossing including cost of pipe -Horizontal directional drilling -Supplying and laying of HDPE pipe of 200 mm dia wall thickness 10mm(PE100 grade-PN10),6 Kg per cm2 with spigot and socket end by trench less method 2.5m to 3m below the ground level in all soil including shoring and shuttering and driving the horizontal bore by ( trenchless technology method) without affecting any highway installations and other service lines. The rate includes the provision of drive pit, entry pit, exit pit as required and removing the soil from the pipe, cost of jointing the pipe with fusion method tying and providing 7/20 SWG GI wire inside the pipe and closing the ends by end cover etc. complete or by any other suitable method as the site condition may warrant as approved by the Engineer at site. All the tools and plants ie machinery, labour and materials are to be provided by the contractor/ tenderer) . |
| 142 | Clearing of juli flora jungle with uprooting disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all Labour charges, Lead, Lift, T&Ps etc., complete. |
| 143 | Removing of black top road and disposed away from the site as directed by the Engineer including cost of labour specification complete. |
| 144 | Earth work excavatin in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small size boulders etc., complete as per standard specification complete |
| 145 | Supplying and filling the trench with M sand along the cable route as per standard specification, including cost of all materials, labour, lead, lift etc., complete. |
| 146 | Transporting and laying of RCC 1:1.5:3 mix UG cable cover slab from casting yard to work site placing in position as required at site. |
| 147 | PCC 1:3:6 using 20mm metal for tower foundation concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. |
| 148 | Laying PCC 1:2:4using 20mm HBG metal for bottom portion of of trench for providing PVC pipe for road crossing ducts in proper and alignment and level as per standard specification including cost of all materials lead, Lift, labour, for laying concrete curing etc., complete. and as per std specification. |
| 149 | Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete. |
| 150 | Reinforced cement concrete in 1:1.5:3 mix using 12 to 20mm HBG machine crushed metal for Joint bay side wall including cost of cement all materilas,labour,curing vibration charges including cost of all leads, lifts as per standard specification etc., complete (but excluding cost of steel reinforcement) |
| 151 | Providing joint chamber BW in CM 1:6 using second class chamber burnt bricks including cost of all materials labour lead lift curing etc complete. |
| 152 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers as per standard specification etc complete. |
| 153 | Disposal of excess earth away in low lying area with a lead of 200 meters, labour, lead, lift as per standard specification complete. |
| 154 | Providing barricade arrangement wherever necessary with 5 cm to 8cm dia casurina vertical post andhorizontal runners (vertical post every 1.0 m c/c for anover all height 1.5m driven 0.30m into the ground +1.20m projected above ground level) and horizontal runners in 3 rows cost of all materials , cutting to size taking pits, not to affect the flow of traffic and movement of public transporting to worksite including lead, lift, lift, etc., complete. Note: The barricade have to be removed and refixed twice, for cutting the trench and secondly for removing the dumped earth for laying the cable and the bidder rate shall provide for such operation. |
| 155 | Supplying and laying the warning grid tape to cover the entire Width of the trench including transporting, cutting and pasting the same with required adhesive etc. complete |
| 156 | Dismantling the brickwork, inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. |
| 157 | Dismantling PCC inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. |
| 158 | Dismantling RCC inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. |
| 159 | Providing Shoring and Strutting using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the casurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. ( Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO ) |
| 160 | Supplying and laying of wooden platform for public convenience to cross over the trench including cost of all transportation making and placing wherever required, labour lead and lift etc,complete as per the direction of Engineer at site. |
| 161 | Supplying and laying 160mm dia PVC pipe at 6 Kg/Cm2 including labour for transporting the PVC pipes, laying in position cutting and jointing the pipe, tying with 7/20 SEG GI wire inside the pipe and closing the ends with end cap including cost of pipe specials, labour, lead, lift, T&P, etc., complete. |
| 162 | Supplying and laying 110mm dia PVC pipe at 6 Kg/Cm2 including labour for transporting the PVC pipes, laying in position cutting and jointing the pipe, tying with 7/20 SEG GI wire inside the pipe and closing the ends with end cap including cost of pipe specials, labour, lead, lift, T&P, etc., complete. |
| 163 | Providing white rubber sheet of size 0.50mx0.30m, 3mm tk. for encasing the 160mm dia PVC pipes at duct ends including cost of all materials, lead, Lift, labour, etc., complete. |
| 164 | Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete. |
| 165 | Supplying, fabricating and Laying of MS platform with heavy angle and sturt support for laying the cable encasing MS pipe beside the road culvert to pass the cable in same alignment of cable trench without infringing and causing any hindrace to the movement of the vehicles etc. complete and as directed by the site Engineer at the time of executing the work (All materials,loading unloading, transporting to sit, labour, tools and equipment, etc. are to be supplied by the Contractor/ tenderer at his own cost only). Please Enable Macros to View BoQ information |