|
| 1 | 60000 Liter OHT: Earth work excavationand depositing on bank with initial lead and lifts of 2m in the following classification of soil as directrd by TWAD Board officers. |
| 2 | For 1St Depth |
| 3 | For 2nd Depth |
| 4 | Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. |
| 5 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. |
| 6 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete. For items 1.5m to 4.5m below GL |
| 7 | For items 0 to 1.50m below GL |
| 8 | For items 0m to 1.5m above GL |
| 9 | For items 4.51m to 7.32m above GL |
| 10 | For items 7.32m to 10.98m above GL |
| 11 | For items 10.98m to 14.64m above GL |
| 12 | For items above 14.64m & up to 18.30m from GL |
| 13 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding |
| 14 | ABOVE G.L. to 3.30m |
| 15 | FROM FLOOR 3.30 TO 4.30 M |
| 16 | 5.30m . to 6.30m |
| 17 | 8.31m . to 9.30m |
| 18 | 11.31m to 12.30m |
| 19 | Curved Surface 0 to 3.30m from floor level |
| 20 | 3.30 to 4.30m from floor level |
| 21 | Square column Below G.L. |
| 22 | Ground level to 3.30 m |
| 23 | Square column 3.31 to 4.30m |
| 24 | 4.31 to 5.30m |
| 25 | 5.31 to 6.30m |
| 26 | 6.31 to 7.30m |
| 27 | 7.31 to 8.30m |
| 28 | 8.31 to 9.30m |
| 29 | 9.31 to 10.30m |
| 30 | 10.31 to 11.30m |
| 31 | 11.31 to 12.30m |
| 32 | Cement painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 33 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. |
| 34 | Supply delivery and fixing of staircase with M30 grade concrete for landings, MS ladder of 0.45m wide using 50x50x5mm MS angles for sides and steps at 0.30m c/c, with GI pipe handrails using 32mm GI pipes for railings and verical support at 0.45m C/c, MS flats (Size 40mm x 5mm ) for horizontal ties at 0.3m c/c and at bottom with Anchor fastener bolts of size 12mm x 75mm including cost of materials labour for fabrication of handrails fixing, painting etc., complete. SOR 2022-23 Page 90 |
| 35 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu |
| 36 | Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers |
| 37 | Providing cut stone slab in CM 1:3 and as directed by RD officers |
| 38 | Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by RD officers. |
| 39 | Painting RD emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by RD officers 65mm Ø GI pipes for inlet connection |
| 40 | 65mm Ø GI pipes for over flow pipe |
| 41 | 65mm Ø GI pipes for scour pipe |
| 42 | 65mm Ø GI pipe for delivery pipe |
| 43 | Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. |
| 44 | Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling. |
| 45 | Supply & Delivery of 7.50 HP Submersible Pump set Discharges :175m & 50 LPM for 150mm dia Borewell as per IS 8034 |
| 46 | Supply & Delivery of control panel board suitable for Three phase Submersible motor with two level Guard & Auto start |
| 47 | Erection Chagres to new submersible pump set ,Fixing of new panel board etc complete |
| 48 | Earth work excavation in all classes of soil for pipe laying works including refilling as per ss 20.b. |
| 49 | Supply and delivery of 90mm dia 6KSC PVC pipe with cost and conveyance inckuding all other labour charges |
| 50 | Labour charges for laying and jointing with cost and conveyance inckuding all other labour charges |
| 51 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package}18% Please Enable Macros to View BoQ information |