| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge All kinds of soil |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge Hard Rock (Requiring Blasting ) |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kindsof soil 70% Ordinary Rock 20% Hard Rock (Blasting prohibited )10 |
| 6 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. Hard Rock (Blasting Prohibited) |
| 7 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. Welded |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc |
| 15 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 16 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 17 | Hand packed stone filling in horizontal elvel including cost of stone |
| 18 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe |
| 19 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete Non-pressure NP-3 class (Medium duty) R.C.C. pipes 1000 mm dia. R.C.C. pipe (laying by anual/mechanical means) |
| 20 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 21 | Providing & making Gabion structure with Mechanically Woven DoubleTwisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter3.0mm, mechanically edged/selvedged with partitions at every 1m intervaland shall have minimum 10 numbers of openings per meter of meshperpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied@ 3% by weight of Gabion boxes, filled with boulders with leastdimension of 200 mm, as per drawing, all complete as per direction ofEngineer-in-charge. |
| 22 | Slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 23 | Slip clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposallead upto 50 m and lift upto 1.5 m. |
| 24 | Slip clearance In soils; mixed with Decomposed Rocks; by blasting or anyother means |
| 25 | Slip clearance In hard rocks; by blasting |
| 26 | Carriage of Sand at an average distance of 15Km by MT |
| 27 | Carriage of Sand at an average distance of 10Km by MT |
| 28 | Carriage of Stone aggregate at an average distance of 15Km by MT |
| 29 | Carriage of Stone aggregate at an average distance of 10Km by MT |
| 30 | Carriage of Stone at an average distance of 15Km by MT |
| 31 | Carriage of Stone at an average distance of 07Km by MT |
| 32 | Carriage of Stone at an average distance of 10Km by MT |
| 33 | Carriage of Mulba at an average distance of 01Km by MT |
| 34 | Carriage of Cement at an average distance of 320Km by MT |
| 35 | Carriage of Cement at an average distance of 285Km by MT |
| 36 | Carriage of Steel at an average distance of 320Km by MT |
| 37 | Carriage of Steel at an average distance of 285Km by MT |
| 38 | Carriage of NP2 (600mm) Pipes at an average distance of 285Km by MT |
| 39 | Carriage of NP2 (100mm) Pipes at an average distance of 285Km by MT Please Enable Macros to View BoQ information |