| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 2 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 3 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 4 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
| 5 | Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete. |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. |
| 7 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site |
| 8 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 9 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 10 | cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum |
| 11 | CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
| 12 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 13 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 14 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. |
| 15 | Filling the soak pit with 40mm metal as per specification |
| 16 | Collection and supply of gravel for filling from approved quarry including cost and conveyance to the site and all labour charges for filling as per standard specification. |
| 17 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 18 | Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc., |
| 19 | Supply of PVC pipes 63mm dia with all labour charges etc complete Please Enable Macros to View BoQ information |