| 1 | Labour for cutting open road for laying water mains or sewer including labour charges cost and conveyance charges etc cmpleted (C.C Road) |
| 2 | Labour for cutting open road for laying water mains or sewer including labour charges cost and conveyance charges etc cmpleted (B.T Road) |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 4 | Supply and fixing of HDPE PIPES - PE 100 AS PER IS 4984/2016 PN10(110mm dia) |
| 5 | Supply and fixing of SPECIALS FOR HDPE PIPES AS PER IS 8360/1977/Part I(Reaffirmed 1992)Part II and III (Reaffirmed 2002) 110mm HDPE Equal tee |
| 6 | 111mm HDPE 90 bend |
| 7 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. |
| 8 | Conveyance of HDPE. Pipes and Specials including labour charges complete etc.,, |
| 9 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers |
| 10 | Refilling with excavted earth for pipe laying workincluding labour charges complete etc.,, |
| 11 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. |
| 12 | Plain Cement Concrete M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 13 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement Please Enable Macros to View BoQ information |