| 1 | RCC Slab Culvert |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)'Ordinary soil'Manual Means'upto 3m depth (without de-watering) |
| 3 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 4 | Stone Masonry Work in Cement Mortar 1:3 for Substructure complete as per Drawing and Technical Specifications.B Courced Rubble Masonry |
| 5 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical SpecificationB. RCC Grade M25Case I. Using Concrete Mixer(i) For solid slab super-structure, 20-30% of (a+b+c)q. Height upto 5m |
| 6 | a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications |
| 7 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specificationA Granular material |
| 8 | Providing & fixing weep holes in head wall, return wall, wing wall and retaining wall complete as per drawings and Technical Specifications Clause 2706. |
| 9 | Drain |
| 10 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materialsOrdinary soilManual Meansupto 3m depth (without de-watering) |
| 11 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for14 days.) |
| 12 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsE RCC Grade M20(p) Height upto 5mCase I Using concrete Mixer |
| 13 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications |
| 14 | Drain Cover |
| 15 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical SpecificationB. RCC Grade M20Case I. Using Concrete Mixer(i) For solid slab super-structure, 20-30% of (a+b+c)q. Height upto 5m |
| 16 | a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Please Enable Macros to View BoQ information |