| 1 | S.H:-Bridge |
| 2 | a) Pile Foundation for Abutment |
| 3 | Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical Specification (Pile diameter - 1000 mm) |
| 4 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification |
| 5 | D. RCC Grade M35(i) Using concrete mixer. |
| 6 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 7 | Dewatering arrangement for excavation upto founding level & Construction at above W.L at two locations |
| 8 | b) Sub- Structure for Abutment |
| 9 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications |
| 10 | F RCC Grade M25(q) Using concrete mixer. |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 12 | c) Superstructure |
| 13 | Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringer, stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, stacking in protected condition etc. complete as per specification and as directed by the Engineer-in-Charge (Carriage cost from fabricator work shop to actual bridge site will be paid seperately).A COMPOSITE BRIDGE Case (i) Upto 40m |
| 14 | Taking delivery of fabricated steelwork from stacks at site as necessary, assembling and erection of fabricated steel structure to proper line , level and camber as per approved drawings complete in all respect including transportation and handling supply of all fasterners. Painting of all exposed surfaces of steelwork after erection with one coat of red lead confirming to IS-102 and two coats Alumunimium paint to IS-2339, grouting of anchor bolts in position, including all labour, consumables, materials, machinery, tools and tackles complete as per specification and as directed by the Engineer- in-Charge |
| 15 | Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 16 | Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 17 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification |
| 18 | C. RCC Grade M 30(r) Height above 10m |
| 19 | E. PSC Grade M-40(r) Height above 10m |
| 20 | A. RCC Grade M 20(p) Height up to 5m |
| 21 | a) Supplying, fitting and placing HYSD bar reinforcement in super- structure complete as per drawing and technical specifications |
| 22 | Drainage Spouts complete as per drawing and Technical specification |
| 23 | Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/ supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.) |
| 24 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 25 | Reinforced cement concrete approach slab including reinforcement and form work complete as per drawing and Technical specification |
| 26 | Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table Please Enable Macros to View BoQ information |