| 1 | Installation of approx. 5000 lights in phase1 at various locations etc. under the municipal limit of Municipal Corporation Manesar. |
| 2 | G.I. bend 32 mm or 25 mm dia, 1 meter long depending on the input of LED light.Rate is taken from work order no. MCF/EE-Elect./2022/1070 dated 29.08.2022 |
| 3 | MS clamp set including nut bolt required to be fix at the height of 7 mtr to 9 meters from the ground level on pole to hold 32 mm or 25 mm ID GI pipe (GI bend) of B class. This MS clamp made of MS sheet 4mm in thickness and length should be sufficient to hold the PCC pole and GI bend of 1 inch dia.Rate is taken from work order no. MCF/EE-Elect./2022/1070 dated 29.08.2022 |
| 4 | Supply and Erection of clamp to hold egg type insulator to be erected at the height of 4.5 mtr including the cost of insulator, MS clamp, nut bolt to tighten the clamp at pole. This cost includes two MS clamp C type of sheet thickness 4 mm. cost also includes nut bolts passing through insulator and clamp. Cost also includes binding cost of cable passing on insulator.Rate is taken from work order no. MCF/EE-Elect./2022/1070 copy attached |
| 5 | S/E of 6A BED switch 1 way make anchor, Havells etc. |
| 6 | Supply and Erection of 9 mtr PCC pole with all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of the work. |
| 7 | Rate analysis for Supply and Erection of Insulated Piercing connector IPC (16-95 sqmm) |
| 8 | S/E/T/C of automatic timer switch timer based powder coated siemens grey panel box made out 1.6 mm thick sheet steel, Contractor 40amp the pole-01 Nos., MCB 40Amp. DP 10KA= 01 No., Voltmeter Digital Type 01 No. Phase indication light RED=01 No., Yellow-01 No., Blue-01 No., Connnector 10mm=03 No., Astronomic Timer Switch M129D = 01 No., with all petty material i.e., Nuts, Bolts, Washers, Ferul Numbers, Cable Ties, Tie Base, Copper PVC Control Wire, Power Wire, Copper Thimbles, Panel Locks, 1-Hooks, PVC Tape, Insulators E type, L-type, Round Type, MCB Chanel, PVC Chanel, Connector Chanel, Connectors. Make -Havelles, G.E./LandT/Siemens/Schinder electric |
| 9 | Cost for removing of all faults, dismantle and erection of 20/36/45/90/120-watt LED lights from GI/PCC poles and replacement of damaged and brunt/faulty LT cables MCB, wire, HDPE pipe etc. including entire satisfaction of concerned Engineer In-Charge for 1st Year... |
| 10 | Cost for removing of all faults, dismantle and erection of 20/36/45/90/120-watt LED lights from GI/PCC poles and replacement of damaged and brunt/faulty LT cables MCB, wire, HDPE pipe etc. including entire satisfaction of concerned Engineer In-Charge for 2nd Year |
| 11 | Cost for removing of all faults, dismantle and erection of 20/36/45/90/120-watt LED lights from GI/PCC poles and replacement of damaged and brunt/faulty LT cables MCB, wire, HDPE pipe etc. including entire satisfaction of concerned Engineer In-Charge for 3rd Year |
| 12 | Cost for removing of all faults, dismantle and erection of 20/36/45/90/120-watt LED lights from GI/PCC poles and replacement of damaged and brunt/faulty LT cables MCB, wire, HDPE pipe etc. including entire satisfaction of concerned Engineer In-Charge for 4th Year |
| 13 | Cost for removing of all faults, dismantle and erection of 20/36/45/90/120-watt LED lights from GI/PCC poles and replacement of damaged and brunt/faulty LT cables MCB, wire, HDPE pipe etc. including entire satisfaction of concerned Engineer In-Charge for 5th Year |
| 14 | Installation of approx. 5000 lights in phase1 at various locations etc. under the municipal limit of Municipal Corporation Manesar. |
| 15 | Installation of approx. 5000 lights in phase1 at various locations etc. under the municipal limit of Municipal Corporation Manesar. Please Enable Macros to View BoQ information |