| 1 | Cement Lime Concrete 1:2:9:24, 0.041 cum cement, 0.082 cum lime, 0.37 cum sand and 1.00 cum stone aggregate, 40 mm nominal size in foundation and plinth HSR item no. 10.19 @ 331.40 plus 450%=Rs 1822.70/- as per Old HSR |
| 2 | Providing and installation of CCTV Camera including 8 channel NVR, 6 No 4 MPIP camera POE 8 PORT SW GIGA, DLINK CAT6, RACK 2U, WD Hard Disk 6TB and display LED not less than 27`` including services charges and completed in all respect |
| 3 | Credit of RCC NP3 900 mm dia pipe |
| 4 | S/o and C/o stone spalls of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rate for the year 2025- 26 for Ambala, Panchkula, Kaithal and Kurukshetra. |
| 5 | [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] |
| 6 | [11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate] |
| 7 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 8 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] |
| 9 | [13.28]Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. [Through Rate] |
| 10 | [13.37.1]Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 1. 80x1.25 mm M.S. laths with 1.25 mm thick top cover [Through Rate] |
| 11 | [13.6.2]Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. 2. Using flats 30x6mm for diagonal braces and central cross piece [Through Rate] |
| 12 | [13.9.2]Providing and fixing fly proof wire gauze to windows, clerestory windows and doors with M.S. Flat 15x3 mm and nuts and bolts complete. 2. Stainless steel (grade 304) wire gauze of 0.5 mm dia wire and 1.4 mm aperture on both sides [Through Rate] |
| 13 | [16.27]Filling cement bags with sand, sewing and laying in position within 30 metres in water including cost of strings by mechanical/ mannual means. [Through Rate] |
| 14 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] |
| 15 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] |
| 16 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] |
| 17 | [2.B0246] B0246. Turbo ventilators 24 with accessories [Rate] |
| 18 | [2.B0976] B0976. Empty Cement bags [Rate] |
| 19 | [2.B1606] B1606. Chlorinated Polyvinyl - chloride (CPVC) pipe 100 mm inner dia [Rate] |
| 20 | [20.71.1]Supply, erection, testing of Ceiling fans IS marked (as per IS code 374) with suitable GI pipe complete in all respects complete as per directions of Engineer-in-charge 1. 48\\" (1200mm) [Through Rate] |
| 21 | [20.72]Supplying, errection, testing of Exhaust fan (as per IS code 374) having a capacity of 45 cubic metre per minute complete with suitable G.I sheet ducting in structure confirming to latest IS specifications complete in all respect to satisfaction of Engineer-in-charge. [Through Rate] |
| 22 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate] |
| 23 | [21.95.8]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 8. 900 mm [Through Rate] |
| 24 | [22.1.2]Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: 2. White vitreous chinaware Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap [Through Rate] |
| 25 | [22.106.1]Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 1. 15 mm nominal bore [Through Rate] |
| 26 | [22.171.1]Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8m long complete as per standard design. 1. With common burnt clay non-modular bricks of class designation 7.5 [Through Rate] |
| 27 | [22.181]Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. [Through Rate] |
| 28 | [22.24.1]Providing and fixing white vitreous chinaware pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous chinaware flushing cistern and C.P. flush bend with fittings and C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : 1. W.C. pan with ISI marked white solid plastic seat and lid [Through Rate] |
| 29 | [22.39.1]Providing and fixing P.V.C. low level flushing cistern with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete. 1. 10 litre capacity - White [Through Rate] |
| 30 | [22.47]Providing and fixing white vitreous chinaware flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. [Through Rate] |
| 31 | [22.87.1]Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings This includes jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge. External work 1. 15 mm nominal outer dia Pipes [Through Rate] |
| 32 | [22.87.3]Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings This includes jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge. External work 3. 25 mm nominal outer dia Pipes [Through Rate] |
| 33 | [23.22.4.2]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 4.2. Supply and erection of double door sheet steel enclosure distribution board suitable for MCBS and ELCBS etc. recessed in wall including bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. SPN DB Double Door 8 way ( 2 incoming and 6 outgoing) [Through Rate] |
| 34 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] |
| 35 | [23.22.5.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.3. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Double POLE [Through Rate] |
| 36 | [23.3.3.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 3.1. Wiring for Light/Fan/call bell point in 1.5 sqmm FRLS PVC insulated copper conductor cable in 1.6 mm thick PVC conduit pipe, without separate control switch Group A [Through Rate] |
| 37 | [23.3.4.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 4.1. Wiring in PVC conduit system for 3-pin 5amp. Plug point by using 2 no 1.5 sqmm FRLS copper wire and 1 no 1.5 Sqmm FRLS copper wire , including providing 1 no 5/6 Amp 3/5 pin socket and 1 no 5/6 Amp switch required MS Box etc complete as required Group A [Through Rate] |
| 38 | [23.3.5.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 5.1. Wiring in PVC conduit system for 3-pin 15amp. Plug point by using 2 no 4 sqmm FRLS copper wire and 1 no 4 Sqmm FRLS copper wire for earthling , including providing 1 no 15/16 Amp 3/6 pin socket and 1 no 15/16 Amp switch required MS Box etc complete as required Group A [Through Rate] |
| 39 | [23.8.1.13]FITTING AND ACCESSORIES 1.13. Providing and fixing Piano type accessories of approved make in existing box and Bakelite sheet including fixing and making necessary connections, complete in all respect. Socket size rotary step type Electronic regulator for A.C. ceiling fan [Through Rate] |
| 40 | [24.2.2.1]LT CABLE 2.1. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:-2.5 Sq mm to 10 Sq mm 2 to 4 Core [Through Rate] |
| 41 | [24.4.1.1]STREET LIGHT 1.1. 3 metres long 50 mm dia pole duly embedded 0.6 m below ground level. 3 metres long 50 mm dia pole duly embedded 0.6 m below ground level. [Through Rate] |
| 42 | [24.4.2.4]STREET LIGHT 2.4. Supply and erection of GI bracket made of 32 mm dia medium class GI pipe, having 15 deg angle from horizontal, suitable for fixing on top of Street Light pole 150 cm long, with 30 cm high suitable size pole cap. [Through Rate] |
| 43 | [24.7.7]RCC FOUNDATIONS FOR DG SET 7. 500 KVA DG Set [Through Rate] |
| 44 | [30.24]Distempering with dry distemper of approved brand and manufacture (one or more coats) and of required shade on old work to give an even shade. [Through Rate] |
| 45 | [34.1.1]Cast in Situ Cement Concrete M20 KerbConstruction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer [Through Rate] |
| 46 | [34.10.2]Informatory sign board 600x600 rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 3 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 2. Using high intensity Microprisomatic grade retro reflective Sheeting Class B as per IRC 67 2012 [Through Rate] |
| 47 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 48 | [5.53.2]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 2. above 600 mm dia [Through Rate] |
| 49 | [6.22.2.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to Plinth Level : M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum) [Through Rate] |
| 50 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] |
| 51 | [6.25.2]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level [Through Rate] |
| 52 | [6.26.1]Extra for providing richer mixes up to plinth and at all floor levels. 1. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) [Through Rate] |
| 53 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] |
| 54 | [6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. [Through Rate] |
| 55 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] |
| 56 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate] |
| 57 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] |
| 58 | [6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate] |
| 59 | [6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate] |
| 60 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 61 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 62 | [9.22.1]Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1. 1.00 mm thick with zinc coating not less than 275 gm/m² [Through Rate] Please Enable Macros to View BoQ information |