|
| 1 | HSR Item 7.22.1-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 2 | HSR Item 6.9.2-Providing and laying damp-proof course with cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zoneIII): 3 graded stone aggregate 20mm nominal size) 2. 40 mm thick |
| 3 | HHSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zoneIII): 3 graded stone aggregate 20 mm nominal size) |
| 4 | HSR Item 6.29.1-Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns |
| 5 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 6 | HHSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | HHSR Item 10.37.1-Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick |
| 8 | HHSR Item 9.14.1-Providing and laying brick tiles over mumty roofs, grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement, over 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat: 1. With common burnt clay non-modular brick tiles of class designation 10 |
| 9 | HSR Item 9.17.1-Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : 1.In 75x75 mm deep chase |
| 10 | HSR Item 2.RM098- RM098. HDPE pipes 75mm dia |
| 11 | HSR Item 28.6-`Providing and applying waterproofing treatment to sound, moisture free concrete surface using liquid applied single component pitch free polyurethane coating capable of bridging substrate cracks up to 2 mm. It shall be applied in two coats at coverage rate of 2kg/sqm to a achieve a minimum DFT of 1.3 mm. The membrane formed shall confirm to following minimum properties:1) Elongation : )400% as per ASTM D 412 2) Tensile Strength : 2.5 N/mm2 as per ASTM D 412 3) Adhesion in-peel test : )50 N as per ASTM C- 836 4) Recovery from 350% elongation : 95% as per ASTM D 412 5) Water Vapour Transmission 2.3mm film: 0.6 g/m2/hr 6) Initial Hardness Shore A : min 60 as per ASTM D 2240 7) Root resistant : protection screed required System includes supply , application and termination of coating all complete as per the manufacturer`s methodology. Clean the RCC slab/screed surface and wall for treatment by removing dust, dirt and layers of concrete over the surface. etc. by mechanical tools and wire brushing. Pressure grouting at construction joints or honeycombs with non shrink cementations grout by mixing shrinkage compensating admixture per bag of cement as per manufacturer`s recommendations. Prepare a side gola of 50X50 mm at the junction using polymer modified mortar. Providing and applying liquid applied single component pitch free polyurethane coating in 2 coats at coverage rate of 2kg/sqm to a achieve a minimum DFT of 1.3 mm. (Fibre cloth/fleece/reinforcement should not be used in between two coats of PU as it has adverse effect on elongation property and also affects bonding with slab). Termination shall be done 300 mm above FFl by providing a groove cut of 30mm x 30mm and seal it with shrinkage compensated polymer modified mortar. Lay a 150 GSM geotextile layer to protect the coating from external damage on final coating before laying of screed concrete/final finish. It shall be applied as per manufactures specification. Rates are incl of surface preparation, grouting and chemical application only. (Rates for geotextile, protection plaster and final finishes such as screed or Brick bat filling for slope, china mosaic, tiles etc is not included in above item. It will be added as per EIC requirements). |
| 12 | HSR Item 11.71.1-Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work |
| 13 | HSR Item 11.5.2-12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) |
| 14 | HSR Item 6.1.4-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) |
| 15 | HHSR Item 6.5-Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer`s specification. |
| 16 | HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform |
| 17 | HSR Item 4.16.1.2-Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.2. All kind of soil Pipes, cables etc, exceeding 80 mm dia but not exceeding 300 mm dia |
| 18 | HSR Item 22.218.2-Providing and Supplying of class SN 8 structured wall Polyethylene Piping system (Pipe with online/ offline coupler and elastomeric sealing ring) with non smooth external annular corrugated and smooth internal surface (double wall) for non-pressure underground sewerage and drainage application as confirm to IS 16098 (part II):2013 including transportation, frieght charges, inspection charges, loading, unloading, complete as specified and directed by Engineer In-Charge. 2. 300 mm Internal Diameter |
| 19 | HSR Item 4.6-Extra for levelling and neatly dressing of disposed soil completely as directed by Engineer-in-charge. |
| 20 | HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts |
| 21 | HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 22 | HSR Item 6.29.2-Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 23 | HSR Item 11.68.1-Applying priming coat: 1. With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) |
| 24 | HSR Item 11.96.1-Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 1. New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 25 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. |
| 26 | NS Item -Supply, erection and commissioning of electromechanical equipments for STP capacity 40 KLD |
| 27 | HSR Item 13.7.1-Fixing standard steel glazed doors, windows and ventilators in walls, including fixing of float glass panes with glazing clips and special metal-sash putty of approved make, or metal beading with screws, (only steel windows, glass panes cut to size and glazing clips or metal beading with screws, shall be supplied by department free of cost. 1. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 28 | HHSR Item 13.3.1.1-Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 2.0 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 2.00 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed byEngineer-in-charge: 1.1. Profile B Fixing with adjustable lugs with split end tail to each jamb |
| 29 | HSR Item 13.10.1-Providing and fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 1. 4.0 mm thick glass panes |
| 30 | HSR Item 13.6.1-Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. 1. Using M.S. angels 40x40x6 mm for diagonal braces |
| 31 | HSR Item 34.29.1-GI barbed wire fencing 1. G.I Barbed Wire Fencing 1.2 Metre High Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 |
| 32 | HSR Item 7.20.1-Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 33 | HSR Item 4.31.1-Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil |
| 34 | HHSR Item 6.16-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 35 | HHSR Item 6.15.1-Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zoneIII) : 3 graded stone aggregate 20 mm nominal size) |
| 36 | HHSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineerin-charge. 1. All kinds of soil |
| 37 | HSR Item 4.32-Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Please Enable Macros to View BoQ information |