| 1 | Laying & dressing of following 33 KV XLPE cable in the excavated cable trenches is per drawing no. PLN(D)/SS/126, dt. 23.06.2018 and instruction of the Site Engineer:Cable 33 KV XLPE 3 x 400 sq. mm |
| 2 | Survey of H.T & L.T cable route as per instruction of Site Engineer and submission of route survey drawing ( in two copies) inscribing different land marks |
| 3 | supply & laying of 1st Class Bricks (Kiln Burnt) |
| 4 | Excavation of soil by cutting of Metalled Road/Cement Concrete/Brick Soling etc & re- instatement of the same as per instruction of Site Engineer |
| 5 | Micro-Tunnelling work with laying of HDPE pipe as per instruction of Site Ingineer and as per site condition for laying of U.G. cable including supply of HDPE pipe as per IS: 4984-2016 including preparation and submission of drawing for such cable laying:With 200mm dia. HDPE Pipe of PE-80, PN-6 |
| 6 | Supply & fixing/ laying of G.I Pipe (Medium) as per I.S.I of the following sizes suitable for cable protection as per instruction of Site Engineer: G.I Pipe 200 mm dia. (Medium) TATA/JINDAL/ EQUIVALENT |
| 7 | STAY SET COMPLETE WITH ALL FITTINGS, GUY INSULATOR BINDING ETC:HT STAY SET (1830X20 mm) |
| 8 | Making & fixing of end termination joint Indoor/ outdoor type for 33 KV XLPE cable including fixing of the jointing box at the existing structure as per instruction of the Site Engineer: Cable 33 KV XLPE 3 x 400 sq. mm |
| 9 | Making of Straight Through/Transition Joint including making of jointing pit of he following 33 KV XLPE cable without supply of jointing materials excluding naking of\\"protection duct for cable joint\\": Cable 33 KV XLPE 3 x 400 sq. mm |
| 10 | Supply and fixing of 50 mm dia 3mtr long G.I pipe to be linked up with 50x6 mm G.I strip for earthing arrangement |
| 11 | Making protective duct for cable joint complete as per WBSEDCLs approved No. drawing (Ref. Drg. no. PLN(D)/SS/127, dt. 23.06.2018) |
| 12 | EARTHING COMPLETE WITH DRIVING OF EARTH SPIKE & CONNECTION OF EARTH ELECTRODE WITH NON CURRENT CARRIN METALIC PARTS OF SUPPORTS. STAY WIRE, CRADLE GUARDS, L.A. ETC. |
| 13 | Fixing of Caution Board |
| 14 | ERECTION OF DOUBLE POLE STRUCTURE COMPLETE WITH ALL FITTINGS AND FOUNDATION: RAIL POLE UPTO 12.81 MTR. LONG(with painting) |
| 15 | Excavation of soil for formation of cable trenches & re-instatement of cable trenches with the excavated soil as per direction of Site Engineer. |
| 16 | Fixing of 42 KV class L.A (33 KV) & Fabrication of structure 33 KV |
| 17 | Supply & Erection of Cast Iron Cable Marker on concrete foundation blocks for straight run, road crossing, joint location etc as per drawing no. PLN(D)/SS/128 dt. 23.06.2018 & specification & direction of Site Engineer. |
| 18 | Complete GIS Survey Please Enable Macros to View BoQ information |