| 1 | Part (A) Bituminous PartExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 4 | Providing, laying and spreading material on a prepared sub-grade, adding cement @2% by wt. to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined copmressive strength to form a layer of Sub-base. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 5 | Cement Treated base Providing, laying and spreading in uniform layers with motor grader on a prepared sub base cement @4% by wt. to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined copmressive strength to form a layer of base. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 6 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 8 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 9 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 10 | Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 11 | Brick masonry work in cement mortar (1:3) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 12 | Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 13 | Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 14 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 15 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 16 | Plain/reinforced cement concrete M20 (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 for Coping. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 17 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (With Ordinery Earth in Patri Work) Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 18 | Cost of maintenance for Bituminous work portion for IInd Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 19 | Cost of maintenance for Bituminous work portion for IIIrd Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 20 | Cost of maintenance for Bituminous work portion for IVth Year @ 2.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 21 | Cost of maintenance for Bituminous work portion for Vth Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO Please Enable Macros to View BoQ information |