| 1 | Marching of 3000 GPM Pump, motor set with the drum pontoon |
| 2 | Dismantlin & transportin of Hose pipe |
| 3 | Dismantling & withdrawal of 3000GPM Pump along with the Motor, Starter & base late from Pontoon. |
| 4 | Dismantling, transporting & fitting of suction of the pump |
| 5 | Dismantling & withdrawal of pontoon 01 set (2 big box and 4small box of 3000 GPM Pump from main patch sump |
| 6 | Transporting of dismantled pontoon set (2big box and 4small box) from existing position to the lower/proposed side of the main patch sump manually 8head x 2shift head x 02 times =32 heads |
| 7 | Assembling & installation the Pontoon on the proposed lower side of the sump |
| 8 | Transporting of 3000GPM Pump motor set with basplate from its existing position to the proposed lower side of the sump |
| 9 | Installation of the Pump, motor & baseplate on the pontoon with proper aligment including fitting of coupling belt & |
| 10 | Dismantling, transporting & fitting of suction of the pump |
| 11 | Dismantling, transporting & fitting of 10\\"dia Nipple, 10\\" dia M.S Bend, 10\\"dia shortpiece in the delivery side of the pump |
| 12 | Dismantling, transporting, laying & jointing of 8\\" dia M.S. pipe in th delivery 24+25=49Nos x 20'=980ft. |
| 13 | Fabrication & making of 8\\" dia M.S bend |
| 14 | Fabrication & making of 8\\" dia short piece |
| 15 | Fabrication & making of 8\\" dia Tapper |
| 16 | Dismantling, transporting & fitting of 8\\"dia hose for jointing of delivery of pump |
| 17 | Dismantling, transporting & fitting of sluice valve & N.R valve 02set x 2 times |
| 18 | Providin of rubber joints |
| 19 | Providin of bolt & nut with washer |
| 20 | Alignment of pump motor set & commissionin the pump |
| 21 | Extension of suction pipe 04 times |
| 22 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |